Laserfiche WebLink
<br />Page 3 <br />Proposal for Phase II Investigation 707 Bradford, Redwood City, CA. <br />PROJECT COST (INCLUDES REPORTS) <br />GEl will complete the project scope specified above on a time & materials basis not to <br />exceed the cost provided below. <br />Total Cost......... ..... ......... ...... ................. ........................... ............. .................... .... .$20,000 * <br />*GEI has provided an itemized breakdown of estimated costs below. <br />ITEM ESTIMATED COST <br />1. Work plan preparation and drafting 1200 <br />2. Field work (CA RG and field-tech) 1900 <br />3. Report including all figures and table. <br /> (CA RG, Engineer, Senior Staff) 4000 <br />4. Field Instruments 200 <br />5. Lab analytical (STL San Francisco) 9600 <br />6. Driller including mob/demob (Enprobe) 1600 <br />7. Expendables (temp well casings, probe liners, etc.) 300 <br />8. Utility locator and prefield activities 500 <br />9. County Pennit Fee 435 <br />PROJECT TIMELINE <br />Item Completed bv Dav**: <br />Work plan and pennit submittal 3 <br />GPP Response and possible conditions requiring work plan edits 13 <br />Field work and sample submittal 15 <br />Analytical results 20 <br />Report Submittal to RWC 23 <br />** Business day after execution of contract (Day 0). <br />PROJECT LIMITATIONS <br />GEl's scope of work and projected cost does not include disposal of soil cuttings or <br />decon water. San Mateo County GPP may require additional scope items not included in <br />this proposal, however these items would be known prior to initiation of field work. <br />************************************************************************ <br />Please call me at (650) 508-8018 if you have any questions regarding this proposal. <br />Respectfully, <br />re. Ú)iélÚw <br />Christopher Wellise <br />Manager, Real Estate <br />Solutions & Strategies <br />