My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2017-022476 STMMA_2485 El Camino Real_Target Corp.
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2017-022476 STMMA_2485 El Camino Real_Target Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 1:00:29 PM
Creation date
3/15/2017 3:16:56 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA Agreement Target
Doc Num
2017-022476
Rec Date
3/15/2017
APN
054-112-230
Address
2485 El Camino Real
Parties
Target Corp
MO Ref
17-035
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o <br />m + TRENCH DRAIN FOR <br />EXPOSED DOCK AREA <br />OVERFLOW DRAIN -OVERFLOW <br />/ - AND OUT FLOW TO DRAIN <br />STORM DRAIN SYSTEM <br />OVERFLOW <br />SO - = i S _ -x�l-._'-` DRAIN <br />EX. T STORM <br />SUMP PUMP DRAIN LINE <br />BIO -FILTRATION <br />PLANTER <br />PIPE FROM SUMP PUMP <br />TO PLANTER <br />TARGET STORE T 321 <br />PREPARED BY: <br />A , gift u TARGET STORE NO 321 GRAPHIC scA <br />PLPARTNERS � 2485 EL CAMINO REAL <br />REDWOOD, CA <br />DATE: 12/22/16 EXHIBIT B-2 <br />Ao p 1, DRAINAGE SYSTEM <br />�11REV. 01-1 ^T I^ T 0-17 PR <br />
The URL can be used to link to this page
Your browser does not support the video tag.