My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2017-022476 STMMA_2485 El Camino Real_Target Corp.
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2017-022476 STMMA_2485 El Camino Real_Target Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 1:00:29 PM
Creation date
3/15/2017 3:16:56 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA Agreement Target
Doc Num
2017-022476
Rec Date
3/15/2017
APN
054-112-230
Address
2485 El Camino Real
Parties
Target Corp
MO Ref
17-035
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NHOLE <br />REF 5/PMW2— <br />TYP OF 4 <br />FD -6T5 — — <br />HIGH WATER LEVEL T'R OF 4 <br />ALARM PANEL <br />7 <br />—i i. tS <br />1 FLOW <br />'_--: VALVE PIT mTHy _I. <br />2" PVC PIPE A45HTO M-20 REi 4 <br />1 2, BELOW GRADE HEAVY DUTY CO*R <br />REF 6/PM502 <br />t PVCP <br />3' BELOW <br />I <br />4' <br />0 <br />I I I <br />I� <br />I <br />L'll R `EI'%II:G <br />1311 <br />I I LLN ' )AiF <br />6� <br />ISO <br />�Ytt�A� <br />�I <br />Q I <br />LOAOMC DOCK xAlp <br />I O <br />1-2' ANT KIP <br />P U <br />SURVEYING <br />I I <br />—2" VIDN1 <br />PARTNERS <br />INC <br />BELOW_ <br />■ <br />GRALE C%ISIING 6' 55 <br />PH 925-270-1515 <br />cT^^^^^ <br />REV. 01-18-17 PR^^t <br />I <br />46-10' <br />2Y—D" <br />I <br />II II I I III ILII I ILII I. I I I JI611ILII III <br />1 <br />1 <br />Illlllllillrtl II ILII �JI�IIIII'd I JIIM16J�JIIIII AM1I:I f.III �IIIJ LI <br />I ro-2 I <br />1D-2 HFAW 1RAFFlC H-20 WUm <br />TItENCYi DRMN WIIN VENIIlAlEO <br />COVERS AND HEAVY DUTY CHANNE <br />I <br />ROUTE DOWNSPOUT <br />FROM ROOF CANOPY <br />TO TRENCH DAWN -- - - <br />CIILPERF�_Q�1R PLUMBING PLAN <br />ENGINEERING <br />960 ATLANTIC AVENUE <br />SURVEYING <br />ALAMEDA, CA 94501 <br />LANDSCAPE <br />PLS <br />PARTNERS <br />INC <br />ARCHITECTURE <br />■ <br />ENTITLEMENT <br />PH 925-270-1515 <br />cT^^^^^ <br />REV. 01-18-17 PR^^t <br />JOB <br />EXHIBIT B-3 IN 1058 <br />SCALE: NTS <br />TARGET T3212 DATE: 12/22/16 <br />2485 EL CAMINO REAL SHEET: <br />REDWOOD CITY, CA B-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.