My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2017-022479 STMMA_1629 Main Street_WL Butler Office Building_3.15.2017
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2017-022479 STMMA_1629 Main Street_WL Butler Office Building_3.15.2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 1:02:38 PM
Creation date
3/15/2017 3:23:36 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA W.L. Butler Office Building
Doc Num
2017-022479
Rec Date
3/15/2017
Address
1629 Main St.
Parties
Butler Realty III, LLC
MO Ref
17-028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Flow -Through Planters Maintenance Plan <br />Property Address: <br />Date of Inspection: <br />Treatment Measure No.: <br />Table 2 <br />Routine Maintenance Activities for Storm main Lift Station & Detention Pipe <br />No. <br />Table 1 <br />Frequency of Task <br />1 <br />Routine Maintenance AaBviffes for Flow-Ttrough Planters <br />No. <br />Maintenance Task <br />Frequency ofTask <br />1 <br />Evaluate health of bees and groundcover. Remove and replace all dead <br />Twice a year <br />and diseased vegetation. Treat vegetation using preventative and lcw tmdc <br />Inspect Storm Drain lift station's sump and remove any buildup, sediment, <br />Monthly during the wet season, <br />methods. <br />and any other debris. <br />2 <br />Maintain vegetation and the Irrigation system. Prune and weed to keep flow- <br />As needed <br />Before wet season and as <br />through planter neat and orderly In appearance. <br />(Inspect <br />biondention basin. Repair or replace any damaged or disconnected piping. <br />3 <br />Check that mulch Is at appropriate depth (3 Inches per soil spe dfloations) <br />Monthly <br />Annually <br />and replenish as necessary. <br />any damage. Repair or replace as necessary. <br />4 <br />Check that soli Is at appropriate depth. TNI or replace soil as necessary to <br />Before wet season and as <br />Monthly during the wet season, <br />maintain a minimum of 5 inches between top of mulch and overflow %air. <br />necessary <br />5 <br />Remove accumulated sedlmenf. Maier and debris from flaw -through planter <br />Monthly during the wet season, <br />events <br />and dispose of properly. Confirm that no dogging will occur and that the box <br />and as needed after storm <br />Monthly, or after large stone <br />will drain YMn three to four hours. Test with garden hose to confirm that <br />events <br />events, and after removal of <br />the planter will drain within three to four hours. <br />6 <br />inspect NDB bubblers to ensure flow Is unimpeded Into the planter. Remove <br />Before the wet season, and as <br />debris and repair as necessary to allow the bubblers to property dsbibuts <br />necessary <br />now. <br />7 <br />Inspect overflow trial and pipe to ensure that It will safely convey excess <br />Monthly during the wet season, <br />flays to storm drain. Repab or replace any damaged or dsconnected <br />and as needed after storm <br />piping. <br />events <br />8 <br />Inspect flow-through planter, including the deenout to ensure that box is <br />Annually <br />structurally sound (no cracks or leaks). Repair as necessary. <br />g <br />Inspect flow-through planter using the atmdwd inspection dheddisL <br />Monthly, or after large storm <br />events, and after remowai ef <br />accumulated debris or material <br />Table 2 <br />Routine Maintenance Activities for Storm main Lift Station & Detention Pipe <br />No. <br />Maintenance Task <br />Frequency of Task <br />1 <br />Inspect Stam Drain lift station to ensure pump, Including the float switch, Is <br />Ongodng <br />functioning adequately. Inoperable pumps must be repaired or replaced <br />Immediately. <br />2 <br />Inspect Storm Drain lift station's sump and remove any buildup, sediment, <br />Monthly during the wet season, <br />and any other debris. <br />and as needed after storm <br />events <br />3 <br />4" Storm Drain face main delivering water from the pump to the <br />Before wet season and as <br />(Inspect <br />biondention basin. Repair or replace any damaged or disconnected piping. <br />necessary <br />4 <br />Inspect Stam Drain face main manhole structure, Inducting the grate, for <br />Annually <br />any damage. Repair or replace as necessary. <br />5 <br />Inspect site detention pipe. Including storm Inlets for any damage, Including <br />Monthly during the wet season, <br />dogs, sediment, or any other debris. Repair or replace any damaged or <br />and as needed after storm <br />disconnected piping. <br />events <br />B <br />Inspect storm drain lift station using the attached inspection list <br />Monthly, or after large stone <br />events, and after removal of <br />accumulated debris or materiel <br />Page 2 <br />Page 24 of 32 <br />REV: 01-26-17 PR <br />
The URL can be used to link to this page
Your browser does not support the video tag.