My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 Wood Rodgers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Under 60K
>
Agmt17 Wood Rodgers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2017 4:59:17 PM
Creation date
3/21/2017 4:50:20 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Wood Rodgers, Inc.
PROJECT NAME
Designe Professsional Agreement Seeport Center Levee Improvement Project
RMP File Number
304.5
Date
3/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br />SCOPE OF SERVICES <br />A. PROJECT DESCRIPTION <br />The Seaport Centre Levee Improvement Project is located at Seaport Centre off of <br />Seaport Boulevard in the City of Redwood City. The Seaport Centre Maintenance <br />District's levee system has been divided into six segments (Segments A, B, C, P, E <br />and F) for planning purposes and consist of levee structures such as berms, CMU <br />block walls, and roadway surfaces. <br />New Base Flood Elevations (BFE) were established for areas neighboring the <br />Seaport Centre office development after the release of the 2015 preliminary Federal <br />Insurance Rate Map (FIRM) for San Mateo County. The current levee protection <br />system within Seaport Centre would lose accreditation with the adoption of the new <br />BFE's. The entire Seaport Centre will be re -mapped as a Special Flood Hazard Area <br />(SFHA) when the preliminary FIRM becomes effective. In order to re -certify the <br />Seaport Centre levee system, deficiencies of the current system will need to be <br />corrected. Necessary remedial solutions include raising the entry to the <br />development, raising the levees around the development, raising the ground at the <br />boat dock area, and adding backflow prevention to outfall pipes for gap closures. <br />B. BACKGROUND <br />BKF Engineers and their subconsultants will prepare the plans, specifications, and <br />calculations for approximately 9,900 feet of levee improvements in connection with <br />the Seaport Centre Levee Improvement Project. Aside from Segment F, the designs <br />for all other segments have been finalized in the 95% design documents prepared <br />by BKF Engineers. For this reason, this project will be conducted in two phases: <br />Phase I: 95% documents excluding Segment F <br />Phase II: 100% documents for Segment F <br />Phase III: Additional as -needed review <br />This project involves design peer review services by a qualified engineering firm. <br />C. SCOPE OF SERVICES <br />The scope of engineering services described herein is the minimum necessary to <br />meet the City's objectives. The consultant is expected to utilize their expertise in <br />carrying out the services set forth herein. <br />Wood Rodgers Inc. (Consultant) shall perform and provide the following: <br />REV: 01-27-17 PR <br />Page 10 of 15 <br />ATTY/AGR.2017.020/Wood Rodgers, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.