My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 Wood Rodgers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Under 60K
>
Agmt17 Wood Rodgers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2017 4:59:17 PM
Creation date
3/21/2017 4:50:20 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Wood Rodgers, Inc.
PROJECT NAME
Designe Professsional Agreement Seeport Center Levee Improvement Project
RMP File Number
304.5
Date
3/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
h. General design considerations — Consultant shall provide any comments based <br />on general design, general constructability, or general operation and <br />maintenance based on our extensive experience evaluating and designing these <br />types of flood control systems. <br />i. Specifications — Consultant shall provide a high level review of the specifications <br />and provide comments based on the need to certify the project. <br />Deliverables: <br />Written comments on the civil and structural drawings, geotechnical report, structural <br />calculations, specifications, and interior drainage report. The comments shall be <br />structured per the above nine considerations, and shall discuss whether the design <br />meets the requirements as documented in relevant levee certification material. <br />TASK 2 — MEETINGS (AS NEEDED) <br />Consultant shall provide written comments and shall meet with the City to discuss as <br />needed. Consultant shall meet with the design consultant BKF Engineers, Inc to <br />elaborate/discuss the comments as needed. <br />PHASE II (100% DOCUMENTS SEGMENT F) <br />Consultant shall complete all the above tasks listed under Phase I (Task 1.1, 1.2, <br />and 2) for segment F. Work under this phase also includes review of any interface or <br />impacts that Segment F may have with the rest of the levee system. <br />PHASE III (ADDITIONAL AS -NEEDED REVIEW) <br />At the direction of the City, Consultant shall provide additional as -needed review <br />services on project documents including, but not limited to, civil and structural <br />drawings, geotechnical report, structural calculations, specifications, and interior <br />drainage report. <br />D. DELIVERY AND COST SCHEDULE <br />Consultant shall follow the cost and delivery schedule for each phase of the project <br />as set forth below: <br />REV: 01-27-17 PR <br />Page 12 of 15 <br />ATTY/AGR.2017.020Mood Rodgers, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.