My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-04-03 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-04-03 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 10:44:41 AM
Creation date
3/30/2017 4:41:02 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/3/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mixed-Use Development and Transit Trip Reduction Evaluation March 20, 2017 <br />P a g e | 3 <br />Table 2 <br />Transit Trip Reductions <br />2014 Transit Mode Share in Downtown <br />Redwood City DPP EIR Transit Reduction <br />17%1 5.6% daily/ 7.3% AM peak hour/ 6.0% PM peak hour <br />1. Source: MTC Commute Model Choice http://www.vitalsigns.mtc.ca.gov/commute-mode-choice <br />Conclusions <br />The evaluation shows that based on the current information, the mixed-use and transit trip <br />reductions for development in the DPP area would be greater than the trips reductions estimated in <br />the DPP EIR because of smaller household size, fewer vehicles owned per household, increased <br />employment surrounding the DPP area, and an increase in the transit mode share. Therefore, <br />using the DPP EIR trip reduction percentages for the 1409 El Camino Real traffic study would not <br />under-estimate vehicle trips generated by the project. <br />8.A. - Page 127
The URL can be used to link to this page
Your browser does not support the video tag.