Laserfiche WebLink
04/03/2017 <br />per the applicable codes and standards and if the test fails an Emergency <br />Responders Radio Coverage System shall be installed. Verify any Blue Box <br />phone communication requirements with the Redwood City Police Department. <br />[SDR][FIRE] <br />50. Addressing and Access —The following requirements apply: [COA][FIRE] <br />a. Addresses must be logical, sequential numbers, i.e. First Floor 101, <br />102, 103, Second Floor 202, 203, 204, as opposed to F303, G401, etc. <br />b. Floor plan maps shall be submitted with unit numbers at all entrances, <br />excluding fire exits. <br />c. Provide a key pad with 24 hour access code for public safety personnel <br />at the main entrance, as opposed to just RFID readers or similar devices <br />51. High -Rise Construction — The building is considered a High -Rise and must <br />comply with all codes for High -Rise construction as the height of the top <br />occupied floor slab exceeds 75 feet. Height is measured from the lowest <br />point of the gutter, at the lowest street elevation. [SDR][BUILDING] <br />52. Elevator Requirements — The following requirements for elevators apply: <br />[SDR][BUILDING] <br />a. One elevator shall be available for use as an accessible means of <br />egress in case of emergency. <br />b. One elevator shall be connected to backup generator power in order to <br />remain operable during emergencies. This elevator shall be provided <br />with appropriate signage and shall extend to all floors including the <br />lower levels of the parking structure <br />c. All additional elevators shall be connected to battery backup with <br />sufficient power to bring the elevator to the exit level in the event of an <br />emergency. <br />d. All elevators shall be equipped with smoke curtains. <br />Construction -Related Activities <br />53. Building Height — The new building is proposed at the maximum building <br />height of the zoning district at 92 ft. Include a specific note on the front page of <br />the plans submitted for building permit review notifying the building inspectors to <br />verify the maximum height in the field. All dimensions, including building location <br />on the site, setbacks, building height, etc. shall be verified by a licensed <br />surveyor. A survey report shall be provided to the Building Inspector for <br />review and approval. [COA][PLANNING] <br />54. Sales and Use Taxes — For commercial projects with a valuation of over $10 <br />million, register with the Board of Equalization to create an ID prior to project <br />construction and operation. This maximizes the City's allocation of sales and use <br />taxes associated with project construction. Contact Nancy Murguia, Finance <br />Department, at (650) 780-7097 or nmurauiae.redwoodcitv.ora. <br />ATN/RESO.0031/ CC RESO ADOPTING DENIAL OF APPEAL BY REDWOOD CITY RESIDENTS FOR RESPONSIBLE DEVELOPMENT <br />REV: 03-30-17 PR RESO. NO. 15575 <br />MUFF NO. 603 <br />Page 17 of 23 <br />