REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br /> <br />April 24, 2017 <br /> <br />SUBJECT <br />Final Acceptance - 2015-2016 Water Main Replacement Project <br /> <br />RECOMMENDATION <br />By motion, accept the 2015-2016 Water Main Replacement Project and authorize the <br />release of bonds and retention according to City procedures <br /> <br />BACKGROUND <br />In 2011, the City Council approved the Water System Master Plan. This plan <br />established priorities for systematically replacing sections of aging water main <br />infrastructure. This approach ensures the continued reliability of the system and <br />provides improved fire protection. Annually, Community Development Department staff <br />identifies and targets for replacement pipeline sections that have experienced service <br />disruptions, excessive maintenance requirements, or capacity limitations due to age and <br />size. The 2015-2016 Water Main Replacement project replaced “priority one” water <br />mains which are generally water mains 4-inches in diameter or smaller. <br /> <br />ANALYSIS <br />On July 25, 2016, the City Council awarded the construction contract for the 2015-2016 <br />Water Main Replacement Project to Casey Construction, Inc. of Redwood City in the <br />amount of $632,498.00. Approximately 2,940 linear feet of deteriorated and undersized <br />cast iron and galvanized iron water pipeline were replaced with more durable PVC pipe. <br />Improvements also included upgrade of residential water services laterals to 1.5-inch <br />polyethylene pipes, replacement of old fire hydrants, and water valves to improve the <br />quality, performance and reliability of the water system for customers. The project area <br />included the distribution and transmission systems within City of Redwood City right of <br />way and other segments on San Mateo County unincorporated area of Emerald Lake <br />Hills, as shown on the attached map. <br />The project has been completed in accordance with the plans and specifications and <br />within the timeframe allowed by contract for a total cost of $635,325.23, which is 0.45% <br />more than the original bid amount. The change orders issued on this project are due <br />quantity adjustments and modifications to the design due to unforeseen field conditions. <br /> <br />ALTERNATIVES <br />Council may choose not to accept the project or authorize the release of bonds and <br />retention; however, this would be contrary to the terms of the contract, prior Council <br />action and public contracting code. <br /> <br />6.2.A. - Page 1