My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-04-24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-04-24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 10:27:20 AM
Creation date
4/20/2017 5:20:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/24/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FISCAL IMPACT <br />Funds for the general work of this project were approved and appropriated in the Fiscal <br />Year 2015-2016 budget as Water Fund Capital Projects – Distribution System <br />Replacement Program, which had an available balance of $3,516,341.13 as of March <br />21, 2017. <br /> <br />ENVIRONMENTAL REVIEW <br />As the lead agency, City of Redwood City determined that the 2015-2016 Water Main <br />Replacement Project met the California Environmental Quality Act (CEQA) exemption <br />criteria as set forth in Section 15302(C) (replacement or reconstruction of existing utility <br />system and/or facilities involving negligible or no expansion of capacity). Therefore, a <br />Notice of Exemption was filed with the office of San Mateo County on June 17, 2016. <br />Furthermore, this project was designed in compliance with the city’s Engineering <br />Standards and currently accepted practices. <br />This project did not require a National Pollutant Discharge Elimination System (NPDES) <br />General Permit for stormwater discharges associated with construction and land <br />disturbance activities pursuant to Attachment A.2 of Order 2010-0014-DWQ which <br />exempts projects to update existing lines and facilities. Additionally, the construction <br />employed stormwater pollution prevention best methods and practices. <br /> <br /> <br />ALEX CHAN, E.I.T. <br />PROJECT ENGINEER <br /> <br />AARON AKNIN, ACIP <br />ASSISTANT CITY MANAGER & COMMUNITY DEVELOPMENT DIRECTOR <br /> <br />MELISSA STEVENSON DIAZ <br />CITY MANAGER <br /> <br />ATTACHMENT <br />1. Project Location Map <br /> <br />6.2.A. - Page 2
The URL can be used to link to this page
Your browser does not support the video tag.