Laserfiche WebLink
Total Costs (max <br />fee)Current Fees Proposed FeesService <br />COMMUNITY DEVELOPMENT DEPARTMENT <br />BUILDING <br />100% <br />$1.00 to $500 $127.59 $35.70 $127.59 <br />First $500 $127.59 $35.70 $127.59 <br />Each Additional $100 or <br />fraction thereof $16.71 $4.68 $16.71 <br />First $2,000 $378.31 $105.83 $378.31 <br />Each Additional $1,000 or <br />fraction thereof $33.09 $21.25 $33.09 <br />First $25,000 $1,139.39 $594.58 $1,139.39 <br />Each Additional $1,000 or <br />fraction thereof $35.01 $15.30 $35.01 <br />First $50,000 $2,014.70 $977.08 $2,014.70 <br />Each Additional $1,000 or <br />fraction thereof $20.06 $10.63 $20.06 <br />First $100,000 $3,017.60 $1,508.33 $3,017.60 <br />Each Additional $1,000 or <br />fraction thereof $19.41 $8.50 $19.41 <br />First $500,000 $10,782.70 $4,908.33 $10,782.70 <br />Each Additional $1,000 or <br />fraction thereof $2.77 $7.23 $2.77 <br />First $1,000,000 $12,168.36 $8,520.83 $12,168.36 <br />Each Additional $1,000 or <br />fraction thereof $3.30 $4.68 $3.30 <br />$125.00 $100.00 $125.00 <br />$125.00 $100.00 $125.00 <br />$125.00 $100.00 $125.00 <br />$124.00 $100.00 $124.00 <br />Actual Costs Actual Costs Actual Costs <br />16% of Building Permit <br />Fee <br />2% of Building Permit <br />Fee <br />16% of Building Permit <br />Fee <br />0.20% of Building <br />Valuation <br />.05% of Building <br />Valuation <br />0.20% of Building <br />Valuation <br />60% of Building Permit <br />Fee <br />70% of Building <br />Permit Fee <br />60% of Building Permit <br />Fee <br />40% of base Building <br />Permit and Plan Check <br />Fee <br />30% of Building <br />Permit Fee <br />40% of base Building <br />Permit and Plan Check <br />Fee <br />a. Deposit* <br />50% of the Remaining <br />Construction Value of <br />Project <br />New <br />50% of the Remaining <br />Construction Value of <br />Project <br />b. Administrative Processing Fee <br /> i. Multi-Family - per unit $309.00 + $20.59 per <br />unit New $309.00 + $20.59 per <br />unit <br /> ii. Commercial - per 1,000 sq. ft.$309.00 + $28.20 per <br />1,000 sq ft New $309.00 + $28.20 per <br />1,000 sq ft <br />*City may deem Temporary Certificate of Occupancy deposits forfeited if <br />project is not completed within designated timeframe. <br />$501 to $2,000 <br />$2,001 to $25,000 <br />$500,001 to $1,000,000 <br />$25,001 to $50,000 <br />$50,001 to $100,000 <br />$100,001 to $500,000 <br />4. Re-Inspection Fee (per hour) <br />10. Plan Check Fee <br />3. Inspections Outside of Normal Business Hours <br />(per hour; min 2 hours) <br />5. Inspection for which no fee is specified (per hour; min 1 hour) <br />6. Additional Plan Check (per hour; min 1/2 hour) <br />7. For use of outside consultants for plan checking or inspections, or both <br />8. Geographic Information System (GIS) maintenance/Technology Fee <br />$1,000,001 to $2,000,000 <br />11. Engineering, Fire, and Planning Plan Check and Inspection <br />12. Temporary Certificate of Occupancy <br />9. General Plan Maintenance Fee <br />2. Single Family Residential Valuation (includes Cross-Departmental Plan Check Fees) <br />For valuations $2,000,001 and above, see Non-Residential/Multi-Family Valuation Table. <br />8.B. - Page 25