|
Total Costs (max
<br />fee)Current Fees Proposed FeesService
<br />COMMUNITY DEVELOPMENT DEPARTMENT
<br />BUILDING
<br />100%
<br />$1.00 to $500 $127.59 $35.70 $127.59
<br />First $500 $127.59 $35.70 $127.59
<br />Each Additional $100 or
<br />fraction thereof $16.71 $4.68 $16.71
<br />First $2,000 $378.31 $105.83 $378.31
<br />Each Additional $1,000 or
<br />fraction thereof $33.09 $21.25 $33.09
<br />First $25,000 $1,139.39 $594.58 $1,139.39
<br />Each Additional $1,000 or
<br />fraction thereof $35.01 $15.30 $35.01
<br />First $50,000 $2,014.70 $977.08 $2,014.70
<br />Each Additional $1,000 or
<br />fraction thereof $20.06 $10.63 $20.06
<br />First $100,000 $3,017.60 $1,508.33 $3,017.60
<br />Each Additional $1,000 or
<br />fraction thereof $19.41 $8.50 $19.41
<br />First $500,000 $10,782.70 $4,908.33 $10,782.70
<br />Each Additional $1,000 or
<br />fraction thereof $2.77 $7.23 $2.77
<br />First $1,000,000 $12,168.36 $8,520.83 $12,168.36
<br />Each Additional $1,000 or
<br />fraction thereof $3.30 $4.68 $3.30
<br />$125.00 $100.00 $125.00
<br />$125.00 $100.00 $125.00
<br />$125.00 $100.00 $125.00
<br />$124.00 $100.00 $124.00
<br />Actual Costs Actual Costs Actual Costs
<br />16% of Building Permit
<br />Fee
<br />2% of Building Permit
<br />Fee
<br />16% of Building Permit
<br />Fee
<br />0.20% of Building
<br />Valuation
<br />.05% of Building
<br />Valuation
<br />0.20% of Building
<br />Valuation
<br />60% of Building Permit
<br />Fee
<br />70% of Building
<br />Permit Fee
<br />60% of Building Permit
<br />Fee
<br />40% of base Building
<br />Permit and Plan Check
<br />Fee
<br />30% of Building
<br />Permit Fee
<br />40% of base Building
<br />Permit and Plan Check
<br />Fee
<br />a. Deposit*
<br />50% of the Remaining
<br />Construction Value of
<br />Project
<br />New
<br />50% of the Remaining
<br />Construction Value of
<br />Project
<br />b. Administrative Processing Fee
<br /> i. Multi-Family - per unit $309.00 + $20.59 per
<br />unit New $309.00 + $20.59 per
<br />unit
<br /> ii. Commercial - per 1,000 sq. ft.$309.00 + $28.20 per
<br />1,000 sq ft New $309.00 + $28.20 per
<br />1,000 sq ft
<br />*City may deem Temporary Certificate of Occupancy deposits forfeited if
<br />project is not completed within designated timeframe.
<br />$501 to $2,000
<br />$2,001 to $25,000
<br />$500,001 to $1,000,000
<br />$25,001 to $50,000
<br />$50,001 to $100,000
<br />$100,001 to $500,000
<br />4. Re-Inspection Fee (per hour)
<br />10. Plan Check Fee
<br />3. Inspections Outside of Normal Business Hours
<br />(per hour; min 2 hours)
<br />5. Inspection for which no fee is specified (per hour; min 1 hour)
<br />6. Additional Plan Check (per hour; min 1/2 hour)
<br />7. For use of outside consultants for plan checking or inspections, or both
<br />8. Geographic Information System (GIS) maintenance/Technology Fee
<br />$1,000,001 to $2,000,000
<br />11. Engineering, Fire, and Planning Plan Check and Inspection
<br />12. Temporary Certificate of Occupancy
<br />9. General Plan Maintenance Fee
<br />2. Single Family Residential Valuation (includes Cross-Departmental Plan Check Fees)
<br />For valuations $2,000,001 and above, see Non-Residential/Multi-Family Valuation Table.
<br />8.B. - Page 25
|