Laserfiche WebLink
Total Costs (max <br />fee)Current Fees Proposed FeesService <br />COMMUNITY DEVELOPMENT DEPARTMENT <br />BUILDING <br />a. Application - $250.00 Remove <br />b. Inspection - $200.00 Remove <br />- $50-500 Remove <br />- Varies Remove <br />- $75.00 Remove <br />- $50.00 Remove <br />$40.00 <br />a. Furnaces (each)$13.00 - $16.00 <br />b. Appliance Vents (each)$7.00 <br />c. Repairs or Additions (each)$12.00 <br />$13.00 - $83.00 <br />e. Air Handlers (each)$10.00 - $16.00 <br />f. Evaporative Coolers (each)$10.00 <br />g. Ventilation and Exhausts (each)$7.00 - $10.00 <br />h. Incinerators (each)$67.00 <br />i. Miscellaneous (each)$1.00 - $10.00 <br />$40.00 <br />a. Plumbing Fixtures (each)$7.00 <br />b. Building Sewer Systems (each)$15.00 <br />c. Rainwater Systems (each)$7.00 <br />d. Cesspools (each)$25.00 <br />$40.00 <br />f. Water Heaters (each)$7.00 <br />g. Gas-Piping Systems (each)$5.00 <br />$1.00 <br />$7.00 <br />$7.00 <br />k. Repair of Drainage (each)$7.00 <br />l. Lawn Sprinkler Systems (each)$7.00 <br />m. Vacuum Breakers (each)$5.00 <br />n. Backflow Devices (each)$7.00 <br />o. Graywater Systems (each)$40.00 <br />$100.00 <br />$100.00 <br />$124.00 <br />14. Reports for Inactive Permits <br />B. MECHANICAL PERMIT FEES <br />13. Building Moving Permits <br />15. Combination Fee (Electrical, Plumbing, and Mechanical Permit Fee) <br />17. Minimum Plumbing, Mechanical, Electrical <br />d. Boilers, Compressors and Absorption Systems (each) <br />e. Private Sewage Disposal Systems (each) <br />h. Additional Gas-Piping Systems (each) <br />C. PLUMBING PERMIT FEES <br />$124.00 <br />2. Unit Fee <br />1. Permit Issuance <br />$124.00 <br />16. Minimum Building Permit Fee <br />1. Permit Issuance <br />2. Unit Fee <br />i. Industrial Waste Pretreatment Interceptors (each) <br />j. Installation/Repair of Water Piping Equipment (each) <br />p. Initial Installation/Testing of Reclaimed Water Systems <br />q. Annual Cross-Connection Testing of Reclaimed Water Systems <br />$124.00 <br />8.B. - Page 26