Laserfiche WebLink
of $5,438,602.68 and $3,545,822.35, respectively, as of February 28, 2017. <br /> <br />ENVIRONMENTAL REVIEW <br />As the lead agency, City of Redwood City determined that the 2016-2017 Sanitary <br />Sewer and Watermain Replacement Project meets the California Environmental <br />Quality Act (CEQA) exemption criteria as set forth in CEQA Guidelines Section <br />15302(c) (replacement or reconstruction of existing utility systems and/or facilities <br />involving negligible or no expansion of capacity). Furthermore, this project was <br />designed compliant with the City’s Engineering Standards and accepted practices. A <br />Notice of Exemption (NOE) will be filed following Council approval. <br /> <br />This project does not require a National Pollutant Discharge Elimination System <br />(NPDES) General Permit for stormwater discharges associated with construction and <br />land disturbance activities pursuant to Attachment A.2 of Order No. R2-2015-0049, <br />NPDES Permit No. CAS612008, which exempts projects to update existing lines and <br />facilities. However, the proposed construction will employ stormwater pollution <br />prevention best methods and practices. <br /> <br />JEFFREY CHOU <br />ASSISTANT ENGINEER II <br /> <br />AARON AKNIN <br />COMMUNITY DEVELOPMENT DIRECTOR <br /> <br /> <br />MELISSA STEVENSON DIAZ <br />CITY MANAGER <br /> <br />ATTACHMENTS <br />1. Project Location Map <br /> <br />RELATED DOCUMENTS IN CITY CLERK’S OFFICE <br />1. Drawings and Contract Documents <br />6.1.B. - Page 3