My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-05-08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-05-08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 8:43:31 AM
Creation date
5/4/2017 3:47:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/8/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
493
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation Monitoring and Reporting Program EXHIBIT B <br />Page 25 of 26 <br />ATTY/RESO.0042/CC RESO CALIFORNIA WAY WATER TANK, PUMP STATION AND PIPELINE PROJECT <br />REV: 05-03-17 PR df <br />IMPACT NOI-1: <br />Construction activities could <br />expose the public to noise <br />levels in excess of standards <br />established in the City’s <br />General Plan and/or Noise <br />Ordinance. <br />Mitigation Measure NOI-2: Impact tools <br />(e.g., jackhammers, pavement breakers, and <br />rock drills), if used for project construction, <br />shall be hydraulically or electrically <br />powered wherever possible to avoid noise <br />associated with compressed-air exhaust <br />from pneumatically powered tools. <br />However, where use of pneumatic tools is <br />unavoidable, an exhaust muffler on the <br />compressed-air exhaust shall be used; such <br />mufflers can lower noise levels from the <br />exhaust by up to 10 dBA. External jackets <br />on the tools themselves shall be used where <br />feasible, which could achieve a reduction of <br />5 dBA. Quieter procedures shall be used, <br />Implementation: <br />The City shall <br />incorporate this <br />noise mitigation <br />measure into all <br />appropriate bid, <br />contract, and <br />engineering and site <br />plan (e.g. building, <br />grading, <br />improvement plans) <br />documents. <br />Timing: Prior to <br />any ground- <br />disturbing activities, <br />Monitoring: The City’s <br />Engineering Division <br />shall review all <br />appropriate bid, <br />contract, and <br />engineering and site <br />(building, grading, <br />improvement plans) <br />documents for inclusion <br />of this noise reduction <br />measure. <br />The City shall <br />periodically inspect the <br />site to ensure the <br />construction process <br />Initials: <br />Date: 8.A. - Page 32
The URL can be used to link to this page
Your browser does not support the video tag.