Laserfiche WebLink
Mitigation Monitoring and Reporting Program EXHIBIT B <br />Page 26 of 26 <br />ATTY/RESO.0042/CC RESO CALIFORNIA WAY WATER TANK, PUMP STATION AND PIPELINE PROJECT <br />REV: 05-03-17 PR df <br /> <br />Mitigation Monitoring and Reporting Program <br />Impact Mitigation Measure Implementation <br />and Timing <br />Monitoring <br />Responsibility <br />Verified <br />Implementation <br /> such as drills rather than impact equipment, <br />whenever feasible. <br />unless otherwise <br />specified. <br />incorporates this noise <br />control measure into <br />daily operations. <br /> <br />IMPACT NOI-1: <br />Construction activities could <br />expose the public to noise <br />levels in excess of standards <br />established in the City’s <br />General Plan and/or Noise <br />Ordinance. <br />Mitigation Measure NOI-3: Construction <br />activities shall be limited to the hours of <br />7:00 a.m. and 4:00 p.m., Monday through <br />Friday, which is more restrictive than the <br />noise ordinance requirements. Signs <br />required by the noise ordinance shall reflect <br />the more restrictive construction hour <br />limitation and also include a day and <br />evening contact number for the job site and <br />a day and evening contact number for the <br />City in the event of problems or excessive <br />noise complaints. If the City receives more <br />than 10 noise complaints during one week, <br />the City shall conduct noise measures while <br />construction is occurring to determine the <br />exact level of noise and whether it exceeds <br />the noise ordinance standards. If the noise <br />ordinance standards are being exceeded, the <br />City shall work with the contractor to <br />devise a strategy to bring noise levels into <br />compliance including erection of <br />attenuating buffers as described in NOI-1. <br />Implementation: <br />The City shall <br />incorporate this <br />noise mitigation <br />measure into all <br />appropriate bid, <br />contract, and <br />engineering and site <br />plan (e.g. building, <br />grading, <br />improvement plans) <br />documents. <br />Timing: Prior to <br />any ground- <br />disturbing activities, <br />unless otherwise <br />specified. <br />Monitoring: The City’s <br />Engineering Division <br />shall review all <br />appropriate bid, <br />contract, and <br />engineering and site <br />(building, grading, <br />improvement plans) <br />documents for inclusion <br />of this noise reduction <br />measure. <br />The City shall <br />periodically inspect the <br />site to ensure the <br />construction process <br />incorporates this noise <br />control measure into <br />daily operations. <br />Initials: <br />Date: <br /> 8.A. - Page 33