Laserfiche WebLink
damages and/or expenses. Upon such withdrawal from an Existing Security, the City shall notify <br />Permittee in writing, by First Class Mail, postage prepaid, of the amount withdrawn and the date <br />thereof. <br />(b) Thirty days after the City's mailing of notice of the cash deposit or bond forfeiture or withdrawal <br />authorized herein, Permittee shall deposit such further cash or bond, or other security, as the City <br />may require, which is sufficient to bring the amount of each Existing Security back to its original <br />amount. <br />(c) The rights reserved to the City with respect to any Existing Security are in addition to all other <br />rights of the City whether reserved by this Permit or authorized by law, and no action, proceeding, <br />or exercise of a right with respect to any cash deposit or bond shall constitute an election or waiver <br />of any rights or other remedies the City may have. <br />4.4 Other Security Provisions. <br />(a) If any Existing Security is a corporate surety bond and, in the opinion of the City, any surety or <br />sureties thereon become insufficient, Permittee shall renew or replace any such surety with good <br />and sufficient surety or sureties within ten (10) days after receiving from City written demand <br />thereof. <br />(b) Any Existing Security consisting of corporate surety bonds shall be kept on file with the City <br />Engineer. If a corporate surety bond is replaced by another approved bond, the replacement shall <br />be filed with the City Engineer and made a part of and incorporated into this Permit. Upon filing and <br />approval by the City Engineer of a replacement bond, the former Existing Security shall be released. <br />(c) If there is an increase to the estimated cost of any work, City may require Permittee to increase <br />the amount of any Additional Performance Security and/or Additional Payment Security so that the <br />applicable securities cover the entire estimated cost of the work. In addition, if there is any increase <br />to the estimated cost of any work, City may also require Permittee to obtain an Additional <br />Performance Security and/or Additional Payment Security even if such additional security had not <br />been originally required with respect to the work. <br />ARTICLE V <br />REMOVAL, RELOCATION AND ABANDONMENT <br />5.1 Upon receipt of a written demand from the City, Permittee, at its sole cost and expense, shall remove <br />and relocate any Facilities installed, used and/or maintained by Permittee under this Permit when <br />such removal or relocation is made necessary (a) due to any work proposed to be done by or on behalf <br />of the City or other governmental agency, including but not limited to, any change of grade, alignment <br />or width of any street, sidewalk or other public facility, installation of curbs, gutters or landscaping and <br />installation, construction, maintenance or operation of any underground or aboveground facilities <br />such as sewers, drains, pipes, power lines, and tracks or (b) due to a determination by the City that the <br />REV: 04-14-17 PR <br />Page 6 of 25 <br />ATTY/AGR.2017.084/S Lanford <br />