Laserfiche WebLink
  <br />4/21/17 (P:\RWC1401D 1548 Maple St\ADMIN\Contract\EIR SOW\1548 Maple EIR SOW 04‐21‐17.docx)  11  <br />be analyzed is the proposed project’s potential impacts related to flooding/sea level rise and  <br />stormwater runoff (quality and rate/volume of discharge). Additionally, compatibility with adjacent  <br />properties will be addressed after additional fill is placed on the site, given that the area is currently  <br />subject to flooding. Site access during flooding events will also be addressed. The existing regulatory  <br />framework for stormwater management, including construction‐period and post‐construction  <br />controls, will also be described. Current and preliminary FEMA mapping will be described and  <br />considered.  This will be presented in the EIR and mitigation measures will be prepared, as needed,  <br />to reduce any impacts to levels of less than significant.  <br />  <br />i. Utilities and Service Systems. LSA will evaluate the impacts to utilities and service systems  <br />that could result from implementation of the proposed project. This section will focus in particular  <br />on the ability of existing utilities and service systems to serve the project. The EIR will identify  <br />standard conditions of approval or mitigation measures that would be applicable to the project, as  <br />necessary. Impacts to energy resources will also be discussed in this section and this topic will be  <br />cross‐referenced to other topical discussions (e.g., air quality and greenhouse gas emissions), as  <br />necessary. The project’s potential contribution to the East 101 Fair Share Plan will also be described.  <br />  <br />2. Other CEQA Considerations  <br />LSA will prepare the appropriate conclusions to fulfill CEQA requirements by providing an  <br />assessment of several mandatory impact categories, including:  <br /> Growth inducement;  <br /> Significant effects that cannot be avoided if the proposed project is implemented;  <br /> Significant irreversible environmental changes if the proposed project is implemented;  <br />and  <br /> Effects found not to be significant.  <br />  <br />The Effects Found Not to be Significant discussion will summarize the findings of the Initial Study.  <br />  <br />3. Alternatives  <br />The LSA team will identify and evaluate up to three alternatives to the proposed project, one of  <br />which will be the CEQA‐required No Project alternative. The two other alternatives will be  <br />developed in consultation with the City. The development and selection of alternatives will be  <br />informed by the input received in response to the NOP, as well as any significant impacts of the  <br />project that are identified in the Draft EIR.  <br />  <br />According to the CEQA Guidelines, alternatives may be evaluated in less detail than the project;  <br />therefore, the alternatives analysis in the EIR will generally be undertaken at a qualitative level.  <br />Alternatives can be a key issue of community concern. Therefore, the discussion will be of sufficient  <br />detail to evaluate the benefits and drawbacks of each alternative, and to provide some qualitative  <br />conclusions regarding the alternatives. Based on this analysis, the Environmentally Superior  <br />Alternative will be identified (as required by CEQA).  <br />  <br /> <br />ATTY/AGR/2017/AMENDMENTS/AMEND NO.1 LSA ASSOCIATES INC. <br />REV: 05-03-17 VR <br />Page 13 of 27 <br />6.1.A. - Page 16