Laserfiche WebLink
  <br />4/21/17 (P:\RWC1401D 1548 Maple St\ADMIN\Contract\EIR SOW\1548 Maple EIR SOW 04‐21‐17.docx)  14  <br />the project’s potential environmental effects that were determined not to be significant, and do not  <br />require mitigation; cumulative effects; feasibility of project alternatives; and the City’s Statement of  <br />Overriding Considerations (if significant unavoidable impacts are identified).  <br />  <br />6. Administrative Record  <br />LSA will compile the Administrative Record related to preparation of the CEQA documents and  <br />provide the appropriate documentation to the City as part of the Final EIR. This task will include  <br />compilation of the Administrative Record in a binder format, organized by subject. Electronic files of  <br />the documentation will also be provided on a CD.  <br />  <br />TASK D.  PUBLIC HEARINGS AND MEETINGS  <br />LSA’s Principal‐in‐Charge (Judith Malamut) and Project Manager (Theresa Wallace) will be available  <br />to attend working sessions with Planning staff to gather information, review progress, arrive at a  <br />reasonable range of alternatives, review preliminary findings, discuss staff comments, and offer  <br />input into discussions on the proposed project. The proposed cost estimate includes attendance by  <br />both Judith and Theresa at the project start‐up meeting and the EIR scoping session, as detailed  <br />above. In addition, we have budgeted (under this task) for attendance at up to four meetings and/or  <br />public hearings with City staff and/or the project team.  Attendance at additional meetings or  <br />hearings would be billed on a time and materials basis.  <br />  <br />TASK E.  PROJECT MANAGEMENT   <br />Judith and Theresa will undertake a variety of general project management tasks throughout the EIR  <br />preparation period. Judith will provide input on the scope, budget, contract negotiations and  <br />management, and scheduling of the project, and will be responsible for the overall quality of all  <br />work undertaken. She will be available for consultation on CEQA procedural matters as well as  <br />application of the CEQA Guidelines to this project.   <br />  <br />Theresa will coordinate the day‐to‐day activities associated with the project, including regular client  <br />contact, oversight of subconsultants and team members, schedule coordination, and development  <br />of products. She will also provide direction to all team members that will ensure an internally‐ <br />consistent, coherent document. Judith and Theresa will review all subconsultant submittals and in‐ <br />house prepared text, tables, and graphics before these materials are presented to the City as  <br />administrative review documents.  <br />  <br />  <br />D. SCHEDULE  <br />The proposed preliminary schedule for this scope of work is shown in Table 2. This scope of work  <br />assumes that the Initial Study will be prepared and finalized prior to submittal of the Administrative  <br />Draft EIR. The Administrative Draft EIR will be submitted to the City within 3 weeks of completion of  <br />the transportation impact analysis inputs by Fehr & Peers.   <br />  <br /> <br />ATTY/AGR/2017/AMENDMENTS/AMEND NO.1 LSA ASSOCIATES INC. <br />REV: 05-03-17 VR <br />Page 16 of 27 <br />6.1.A. - Page 19