My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 RWC 2020 Alta Planning + Design
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Under 60K
>
Agmt17 RWC 2020 Alta Planning + Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2017 11:32:29 AM
Creation date
5/24/2017 11:32:11 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Alta Planning + Design
PROJECT NAME
SRTS Walk Audits 2017
RMP File Number
304.5
Date
5/15/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 2. Recommendations <br />Task 2.1. Draft Recommendations <br />Consultant will prepare a draft set of recommendations that clearly convey a set of <br />proposed improvements in a graphically compelling, easily understandable format. The <br />recommendations will be comprehensive, including all potential improvements based on <br />the findings of the walk and bike audits. Recommended improvements will follow <br />standard CA MUTCD and Caltrans Highway Design Manual standards, and incorporate <br />innovative or experimental treatments as appropriate. <br />Consultant will submit a summary list of potential improvements and a map <br />documenting conceptual improvements to the City and school district for review. <br />Task Deliverables <br />Draft recommendations <br />Task 2.2. Final Recommendations <br />Based on a single set of consolidated comments, Consultant will develop a final <br />conceptual improvement plan and develop planning -level cost estimates for <br />recommended improvements. <br />Task Deliverables <br />• Final conceptual improvement plans for four school sites (Taft, Hoover, Garfield, <br />Selby Lane) with planning -level cost estimates. <br />Task 2.3. Technical Memorandum <br />Consultant will summarize all of the materials developed in into a final technical <br />memorandum. This will describe the process, existing conditions in the study areas, and <br />the final recommended projects, with cost estimates, for implementation. <br />Task Deliverables <br />• Final Technical Memoranda for four schools (Taft, Hoover, Garfield, Selby Lane) <br />PAYMENT DETAILS <br />Consultant will be paid in full upon delivery of the four Technical Memoranda to City. <br />REV: 05-11-17 RL <br />Page 11 of 11 <br />ATTY/AGR.2017.102/RC2020 Alta Planning SRTS Walk Audits 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.