Laserfiche WebLink
ELF Financing Strategy  <br />   San Mateo County ELF Study‐2016  <br />February 21, 2017  <br />  <br />Prepared by Brion Economics Team                    Final Report 34 <br />  <br />  <br />  <br />  <br />  <br />Table A‐5 <br />Detailed Sample New Construction Child Care Center Project Cost Estimates  <br />San Mateo Countywide ELF Study ‐ 2016 <br />No. Type Program Year  <br />2016  <br />Inflation % <br />Construction  <br />Type <br />Facility  <br />Budget  <br />including  <br />FF&E  <br />2016 Adj.   <br />Budget <br />Total Sqft  <br />of Bldg.  <br />Space <br /># of  <br />Children  <br />or Spaces <br />Sqft of Bldg.  <br />Space per  <br />Child <br />Adj. Base  <br />Tenant  <br />Improvements  <br />per sqft (1) <br />Permit  <br />Required  <br />Studies <br />Included  <br />FF&E  % <br />Total Cost  <br />per Bldg.  <br />Sqft <br />Total Cost  <br />per Child  <br />Care Space <br />1 <br />New construction ‐  <br />conventional   <br />Center ‐ I/T ‐  <br />Preschool  2014 2% <br />New stick  <br />construction $6,528,000 $6,658,560 20,000 190 105 $256.00 NA $333 $35,045 <br />2 <br />New construction ‐  <br />conventional   <br />Center ‐ I/T ‐  <br />Preschool 2014 2% <br />New stick  <br />construction $6,152,800 $6,275,856 18,000 152 118 $221.00 NA $349 $41,289 <br />3 <br />New construction ‐  <br />conventional  <br />Center ‐ I/T ‐  <br />Preschool 2014 2% <br />New modular  <br />(not portables)  <br />construction $5,565,252 $5,676,557 20,100 142 142 NA $282 $39,976 <br />4 <br />New construction ‐  <br />conventional   <br />Center ‐ I/T ‐  <br />Preschool 2014 2% <br />New stick  <br />construction $5,328,608 $5,435,180 14,800 114 130 NA $367 $47,677 <br />5Project Frog ‐Modular  <br />Center ‐ I/T ‐  <br />Preschool 2014 2% <br />New prefab ‐ <br />Project Frog $6,819,762 $6,956,157 14,000 114 123 NA $497 $61,019 <br />Averages $6,078,884 $6,200,462 17,380     142 124 $238.50 NA $366 $45,001 <br />Note: Does not include building landscaping or design costs; this can typically cost 10% of outdoor space budget. <br />Inflation Rates are from http://www.bls.gov/data/inflation_calculator.htm <br />(1) TI costs are included in total project costs per sqft but not available for all projects. <br />Sources:  Kathryn Tama; Brion Economics, Inc. <br />Table A‐5 <br />Detailed Sample New Construction Child Care Center Project Cost Estimates ‐ Continued <br />San Mateo Countywide ELF Study ‐ 2016 <br />No. Type Program Year  <br />Additional  <br />Outdoor  <br />Yard  Budget  <br />Sqft of  <br />Outdoor  <br />Space <br />2016 Adj.  <br />Outdoor  <br />Yard Budget <br />Total Cost of  <br />Sqft of  <br />Outdoor  <br />Space <br />Total Cost  <br />per Child of  <br />Outdoor  <br />Space <br />Total  <br />Center &  <br />Outdoors  <br />Costs <br />Overall,  <br />Total Cost  <br />Per Child <br />1 <br />New construction ‐  <br />conventional   <br />Center ‐ I/T ‐  <br />Preschool  2014 $475,000 15,800 $484,500 $31 $2,550 $7,143,060 $37,595 <br />2 <br />New construction ‐  <br />conventional   <br />Center ‐ I/T ‐  <br />Preschool 2014 $378,000 15,000 $385,560 $26 $2,537 $6,661,416 $43,825 <br />3 <br />New construction ‐  <br />conventional  <br />Center ‐ I/T ‐  <br />Preschool 2014 $265,000 15,000 $270,300 $18 $1,904 $5,946,857 $41,879 <br />4 <br />New construction ‐  <br />conventional   <br />Center ‐ I/T ‐  <br />Preschool 2014 $196,000 11,500 $199,920 $17 $1,754 $5,635,100 $49,431 <br />5Project Frog ‐Modular  <br />Center ‐ I/T ‐  <br />Preschool 2014 NA <br />Averages $328,500 14,325         $335,070 $23 $2,186 $6,346,608 $43,183 <br />Note: Does not include building landscaping or design costs; this can typically cost 10% of outdoor space budget. <br />Inflation Rates are from http://www.bls.gov/data/inflation_calculator.htm <br />(1) TI costs are included in total project costs per sqft but not available for all projects. <br />Sources:  Kathryn Tama; Brion Economics, Inc. <br />8.C. - Page 53