Laserfiche WebLink
ELF Financing Strategy  <br />   San Mateo County ELF Study‐2016  <br />February 21, 2017  <br />  <br />Prepared by Brion Economics Team                    Final Report 35 <br />  <br />  <br />  <br />  <br />Table A‐6 <br />Detailed Sample Child Care Renovation Project Cost Estimates  <br />San Mateo Countywide ELF Study ‐ 2016 <br />No. Type Program Year  <br />2016  <br />Inflation %Construction Type <br />Facility  <br />Budget  <br />including  <br />FF&E  <br />2016 Adj.   <br />Budget <br />Total Sqft of  <br />Bldg. Space <br /># of Children  <br />or Spaces <br />Sqft of Bldg.  <br />Space per  <br />Child <br />Adj. Base  <br />Tenant  <br />Improvements  <br />per sqft (1) <br />Permit  <br />Required  <br />Studies <br />Included  <br />FF&E  % <br />Total Cost per  <br />Bldg. Sqft <br />Total Cost per  <br />Child Care  <br />Space <br />1 Remodel Residential Center ‐ Preschool 2014 2%Renovation $572,700 $584,154 1,725              24                  72                  na na $339 $24,340 <br />Commercial Renovation Projects <br />2 <br />LIIF Case Study  <br />Improvements in existing   <br />shell ‐ In affordable housing  <br />Center Infant  <br />toddler        2001 36% <br />Located in LIIF  <br />affordable housing  <br />building  $882,000 $1,199,520 2,775 14 198 $191.00 15%$432 $85,680 <br />3 <br />LIIF Case Study  <br />Improvements in existing  <br />shell ‐ In affordable housing Center ‐ Preschool 2007 16% <br />Located in LIIF  <br />affordable housing  <br />building  Urban $763,280 $885,405 3,730 47 79 $164.00 17%$237 $18,838 <br />Average Commercial Renovations $822,640 $1,042,462 3,253              31                  139               $178 16% $335 $52,259 <br />Note: Does not include building landscaping or design costs; this can typically cost 10% of outdoor space budget. <br />Inflation Rates are from http://www.bls.gov/data/inflation_calculator.htm <br />(1) Open space costs are based on the average cost from Table A‐7, for child care center average outdoor costs. <br />Sources:  Kathryn Tama; Brion Economics, Inc. <br />Residential Renovation Projects <br />Table A‐6 <br />Detailed Sample Child Care Renovation Project Cost Estimates ‐ Continued <br />San Mateo Countywide ELF Study ‐ 2016 <br />No. Type Program Year  <br />Additional  <br />Outdoor Yard  <br />Budget  <br />Sqft of  <br />Outdoor  <br />Space <br />2016 Adj.  <br />Outdoor Yard  <br />Budget <br />Total Cost of  <br />Sqft of  <br />Outdoor  <br />Space <br />Total Cost per  <br />Child of  <br />Outdoor  <br />Space <br />Total Center  <br />& Outdoors  <br />Costs <br />Overall, Total  <br />Cost Per Child <br />1 Remodel Residential Center ‐ Preschool 2014 NA (1) $30,692 na $1,356 $614,846 $25,619 <br />Commercial Renovation Projects <br />2 <br />LIIF Case Study  <br />Improvements in existing   <br />shell ‐ In affordable housing  <br />Center Infant  <br />toddler        2001 $18,000 1,800 $24,480 $14 $1,749 $1,224,000 $87,429 <br />3 <br />LIIF Case Study  <br />Improvements in existing  <br />shell ‐ In affordable housing Center ‐ Preschool 2007 $54,000 4,030 $62,640 $16 $1,333 $948,045 $20,171 <br />Average Commercial Renovations $36,000 2,915              $43,560 $15 $1,541 $1,086,022 $53,800 <br />Note: Does not include building landscaping or design costs; this can typically cost 10% of outdoor space budget. <br />Inflation Rates are from http://www.bls.gov/data/inflation_calculator.htm <br />(1) Open space costs are based on the average cost from Table A‐7, for child care center average outdoor costs. <br />Sources:  Kathryn Tama; Brion Economics, Inc. <br />Residential Renovation Projects <br />8.C. - Page 54