Laserfiche WebLink
ELF Financing Strategy  <br />   San Mateo County ELF Study‐2016  <br />February 21, 2017  <br />  <br />Prepared by Brion Economics Team                    Final Report 36 <br />  <br />  <br />  <br />  <br />Table A‐7 <br />Detailed Sample Child Care Portable Project Cost Estimates  <br />San Mateo Countywide ELF Study ‐ 2016 <br />No. Type Program Year  <br />2016  <br />Inflation  <br />% <br />Construction  <br />Type <br />Facility  <br />Budget  <br />including  <br />FF&E  <br />2016 Adj.   <br />Budget <br />Total Sqft of  <br />Bldg. Space <br /># of  <br />Children or  <br />Spaces <br />Sqft of  <br />Bldg. Space  <br />per Child <br />j <br />Tenant  <br />Improve <br />ments  <br />per sqft  <br />State  <br />Arch/Permit  <br />Required  <br />Studies <br />Included  <br />FF&E  % <br />Total  <br />Cost per  <br />Bldg. Sqft <br />Total Cost  <br />per Child  <br />Care Space <br />1Portables <br />Center Preschool   <br />Located School on  <br />District property 2009 12%New Portable $926,177 $1,040,097 3,696 50 74 $7 $21,000 NA $281 $20,802 <br />2Portables <br />Center Preschool   <br />Located School on  <br />District property 2009 12%New Portable $1,076,132 $1,208,496 3,696 50 74 $7 $21,000 6% $327 $24,170 <br />3Portables <br />Preschool  Located  <br />School on District  <br />property 2012 5%New Portable $518,497 $543,903 1,920 20 96 $1 $12,900 1% $283 $27,195 <br />Average $840,269 $930,832              3,104                  40                  81 $5 $18,300 4% $297 $24,056 <br />Note: Does not include building landscaping or design costs; this can typically cost 10% of outdoor space budget. <br />Inflation Rates are from http://www.bls.gov/data/inflation_calculator.htm <br />Sources:  Kathryn Tama; Brion Economics, Inc. <br />Table A‐7 <br />Detailed Sample Child Care Portable Project Cost Estimates ‐ Continued <br />San Mateo Countywide ELF Study ‐ 2016 <br />No. Type Program Year  <br />Additional  <br />Outdoor  <br />Yard  Budget  <br />Sqft of  <br />Outdoor  <br />Space <br />2016 Adj.  <br />Outdoor  <br />Yard  <br />Budget <br />Cost of  <br />Sqft of  <br />Outdoor  <br />Space <br />Total Cost  <br />per Child of  <br />Outdoor  <br />Space <br />Total Center &  <br />Outdoors Costs <br />Overall,  <br />Total Cost  <br />Per Child <br />1Portables <br />Center Preschool   <br />Located School on  <br />District property 2009 $30,000 3,750 $33,690 $8.00 $674 $1,073,787 $21,476 <br />2Portables <br />Center Preschool   <br />Located School on  <br />District property 2009 $83,868 3,750 $94,184 $22.36 $1,884 $1,302,680 $26,054 <br />3Portables <br />Preschool  Located  <br />School on District  <br />property 2012 $28,800 1,920 $30,211 $15 $1,511 $574,115 $28,706 <br />Average $47,556 3,140         52,695 $15 $1,356 $983,527 $25,412 <br />Note: Does not include building landscaping or design costs; this can typically cost 10% of outdoor space budget. <br />Inflation Rates are from http://www.bls.gov/data/inflation_calculator.htm <br />Sources:  Kathryn Tama; Brion Economics, Inc. <br />8.C. - Page 55