My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 Smart Utility Systems, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 Smart Utility Systems, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2017 11:09:22 AM
Creation date
6/16/2017 11:08:19 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Smart Utility Systems, Inc.
PROJECT NAME
Customer Water Use Portal
RMP File Number
304
Date
6/15/2017
MO Ref
17-110
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Change Control: The following process will be followed if a change to this SOS or project <br />plan is required: <br />4.1. A Project Change Request (PCR) will be the vehicle for Communicating change. The <br />PCR must describe the change, the rationale for the change, and the effect the change <br />will have on the Project. Additionally, the PCR must also provide a recap of the original <br />estimated resources and costs, revised estimated resources and costs and associated <br />cost savings or expenditures. <br />4.2. The designated Project Manager of the requesting party will review the proposed <br />change and determine whether to submit the request to the other party. <br />4.3. Both Project Managers will review the proposed change and agree to take steps to <br />implement it, including a signed Change Order, recommend it for further investigation, <br />or reject it. <br />4.4. Consultant will specify any changes to the fees as per agreed rate in this Scope of <br />Services for such investigation. A Change Order must be signed by authorized <br />representatives from both parties in order to revise the Agreement before any work <br />can commence in regards to such. <br />5. Risks and Assumptions <br />The following assumptions, which have been accepted by City, have been made in order for <br />Consultant to fulfill its obligations under this Agreement, the failure of which by City may affect <br />Consultant's Project Duration and Timeline under Section 2: <br />1. City will provide timely responses to Consultant's information needs and timely review of <br />project documents provided. <br />2. Key personnel at City will be made available to Consultant as required during the project <br />3. City will provide onsite workspace for Consultant's resources with internet connectivity <br />as necessary. <br />4. All documents will be jointly reviewed with City staff. <br />5. The SOS is binding if authorized, and any changes to the SOS will be provided in writing <br />from either the Consultant or the City team and approved by both teams. <br />6. The City fully acknowledges and understands that any customization to standard features <br />and functionality as described in this SOS will be assessed by Consultant and may impact <br />approved budget and/or schedule. City will have discretion to determine whether to <br />proceed with such customizations. <br />7. Integration to City source systems and data is dependent on access to said systems, <br />including as well as API allowances from the respective companies. Consultant will work <br />on behalf of City to obtain such APIs within reason, however City is responsible to ensure <br />such access and API allowances are provided. In addition, existing API or SFTP <br />processes for City source system data, including customer, billing, and usage data, will be <br />made available for use or re -use as part of the project. Ability to view bill PDF is dependent <br />on API availability at the start of this project. <br />8. City agrees to ensure Integration access with City's billing and payment systems provider <br />prior to Milestone 1. Failure to obtain such availability and/or access from City's billing <br />provider shall not affect City's obligations under this Agreement. <br />9. Standard SLA levels offered by Consultant are acceptable including 99.999% availability <br />and a recovery point objective of 24 hours. Please refer to Consultant's Product Support <br />document. <br />10. Standard implementation and configuration by Consultant is conducted primarily from <br />Consultant's offices with any included on-site activities to be determined and documented <br />during Milestone One. Additional Consultant resources beyond those so identified will <br />travel to City offices on an as -requested basis if and when practicable. Any such requested <br />on-site implementation activities will be billed to City at a minimum rate of $150 per <br />individual per work hour. <br />Page 21 of 38 <br />ATTY/AGR/2017.104/SMART ENERGY SYSTEMS—CUSTOMER WATER USE PORTAL <br />REV: 05-15-17 MI <br />