My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 ABAG and SFEP Regional Water Management Grant
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 ABAG and SFEP Regional Water Management Grant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2019 9:27:35 AM
Creation date
6/28/2017 12:09:52 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Association of Bay Area Governments (ABAG) on behalf of San Francisco Estuary Partnership (SFEP)
PROJECT NAME
Prop 84 Integrated Regional Water Management Grant
RMP File Number
304
Date
6/28/2017
MO Ref
17-121, 18-240
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attachment I <br />This task consists of mobilization and site preparation including implementation of site <br />security measures, installation of temporary sanitary facilities, implementation of site <br />BMPs, clearing and grubbing, stockpile and material storage designation, and traffic <br />control. <br />Deliverables: <br />Pre -construction photographs <br />Task 4 c) Project Construction <br />This task includes local flooding alleviation by routing flood flows from the Bayfront <br />Canal and Atherton Channel into managed ponds that are part of the Ravenswood <br />Pond Complex portion of the South Bay Salt Ponds Restoration Project. This task consists <br />of modification of the existing Cargill ditch for improved flow conveyance, <br />modifications to the Pond S5 forebay including excavation/deepening of this smaller <br />portion of Pond S5 immediately adjacent to Flood Slough, and routing of flood flows <br />from the Bayfront Canal into Ponds R5 and S5 of the Ravenswood Pond Complex, <br />thereby bypassing the Flood Slough tide gate. <br />Deliverables: <br />• Construction photographs <br />• Certified engineer inspection completion report with final as -built drawings <br />Task 4 d) Performance Testing and Demobilization <br />This task consist of project performance testing and demobilization, including removal <br />of all debris and construction spoils from the site, removal of excess materials, removal <br />of temporary sanitary facilities, removal of equipment, transfer of site responsibility back <br />to owner, and stormwater testing for contaminants and turbidity levels. <br />Deliverables: <br />• Post -construction photographs <br />Task 4 e) Environmental Compliance/ Mitigation/ Enhancement <br />This task consists of complying with general construction measures, and creating an <br />erosion and sediment control plan, stormwater pollution prevention plan, traffic control <br />plan, a hazardous materials management plan, and any environmental restoration <br />specifications. <br />Deliverables: <br />• A copy of the erosion and sediment control plan <br />• A copy of the stormwater pollution prevention plan <br />• A copy of the traffic control plan <br />• A copy of the hazardous materials management plan <br />• A copy of the environmental restoration specifications <br />Task 4 f) Construction Administration <br />DWR Prop 84- Local Project Sponsor Agreement- IRWM 2- Redwood City- OWP 102244 <br />12 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.