My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 ABAG and SFEP Regional Water Management Grant
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 ABAG and SFEP Regional Water Management Grant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2019 9:27:35 AM
Creation date
6/28/2017 12:09:52 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Association of Bay Area Governments (ABAG) on behalf of San Francisco Estuary Partnership (SFEP)
PROJECT NAME
Prop 84 Integrated Regional Water Management Grant
RMP File Number
304
Date
6/28/2017
MO Ref
17-121, 18-240
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DocuSign Envelope ID: 19070948-2759-4F7F-9299-7EDFDCC97FBF <br />Page I5 <br />Task 4: Construction/Implementation - Budget Category (d) <br />Task 4 a) Public Education and Outreach <br />This task includes public workshops, multi- lingual educational materials, a project website, an <br />outreach campaign via social media, and targeted outreach to five mobile home parks in the <br />historically flood -prone areas of the Project This outreach will reach approximately 2,400 residents in <br />800 dwellings within five mobile home parks and other economically disadvantaged neighborhoods <br />adjacent to the Bayfront Canal and Atherton Channel. <br />Deliverables: <br />• Public workshop, outreach, and educational materials <br />• Links to Project website and social media campaign <br />Task 4 b) Construction Contracting <br />This task consists of construction contracting including solicitations for bids and awards of contracts. <br />Deliverables: <br />• Copy of bid package <br />Task 4 c) Mobilization and Site Preparation <br />This task consists of mobilization and site preparation including implementation of site security <br />measures, installation of temporary sanitary facilities, implementation of site BMPs, clearing and <br />grubbing, stockpile and material storage designation, and traffic control. <br />Deliverables: <br />• Pre -construction photographs <br />Task d) Project Construction <br />This task includes local flooding alleviation by routing flood flows from the Bayfront Canal and <br />Atherton Channel into managed ponds that are part of the Ravenswood Pond Complex portion of the <br />South Bay Salt Ponds Restoration Project This task consists of modification of the existing Cargill <br />ditch for improved flow conveyance, modifications to the Pond SS forebay including <br />excavation/deepening of this smaller portion of Pond S5 immediately adjacent to Flood Slough, and <br />routing of flood flows from the Bayfront Canal into Ponds RS and S5 of the Ravenswood Pond <br />Complex, thereby bypassing the Flood Slough tide gate. <br />Deliverables: <br />• Construction photographs <br />• Certified engineer inspection completion report with final as -built drawings <br />Task 4 e) Performance Testing and Demobilization <br />This task consist of project performance testing and demobilization, including removal of all debris <br />and construction spoils from the site, removal of excess materials, removal of temporary sanitary <br />facilities, removal of equipment, transfer of site responsibility back to owner, and stormwater testing <br />for contaminants and turbidity levels. <br />Deliverables: <br />• Post -construction photographs <br />Task 4 0 Environmental Compliance/ Mitigation/ Enhancement <br />This task consists of complying with general construction measures, and creating an erosion and <br />sediment control plan, stormwater pollution prevention plan, traffic control plan, a hazardous <br />materials management plan, and any environmental restoration specifications. <br />Deliverables: <br />DW R Prop 84- Local Project Sponsor Agreement- IRWM 2 -Amendment 1 -Redwood City - iLPS Contract#C0038991 <br />
The URL can be used to link to this page
Your browser does not support the video tag.