My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC17-07 0032 PC Reso Approving CEQA - 860 Charter St
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2017
>
Reso PC17-07 0032 PC Reso Approving CEQA - 860 Charter St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2017 4:18:31 PM
Creation date
6/28/2017 4:06:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />SEPTEMBER 2016 <br />ROCKETSHIP REDWOOD CITY ELEMENTARY SCHOOL PROJECT <br />INITIAL STUDY/ MITIGATED NEGATIVE DECLARATION <br /> <br /> <br />P:\RWC1401B Rocketship School\PRODUCTS\IS-MND\Public\Rocketship Public Review 09-29-16.docx (09/29/16) PUBLIC REVIEW DRAFT 108 <br />Water service bills from several existing Rocketship schools in the South Bay that have a similar <br />capacity to the proposed project were reviewed to determine projected water demands for the <br />proposed project. It is estimated that the proposed project would result in a demand of approximately <br />913 gallons of water per day. This expected demand would represent less than 0.008 percent of total <br />available water supplies within the City. In addition, low-flow urinals and plumbing fixtures would be <br />installed at the school, which would ensure that water demand is reduced to the extent feasible. The <br />proposed landscaping also includes drought-tolerant California native and/or other suitable plants. <br />Landscaping would also be limited at the site and would not include open lawn areas. <br /> <br />Based on the above, the City would have sufficient water supply to support the proposed project and <br />implementation of the project would not require new or expanded entitlements for water supplies. <br />Therefore, this impact would be less than significant. <br /> <br />e) Result in a determination by the wastewater treatment provider which serves or may serve the <br />project that it has adequate capacity to serve the project’s projected demand in addition to the <br />provider’s existing commitments? (Less-Than-Significant Impact) <br /> <br />Please refer to Section XVI.a for a discussion of the project’s impacts to wastewater treatment. The <br />proposed project would result in a very minor contribution to the daily permitted capacity of the <br />wastewater treatment plant and would not exceed the plant’s capacity. Therefore, impacts related to <br />the capacity of the existing wastewater treatment plant would be less than significant. <br /> <br />f) Be served by a landfill with sufficient permitted capacity to accommodate the project’s solid <br />waste disposal needs? (Less-Than-Significant Impact) <br /> <br />Recology San Mateo County provides solid waste collection, recycling, transportation, and disposal <br />services to Redwood City customers under a franchise agreement. Collected waste is transported to <br />the South Bayside Transfer Station (SBTS), located in the City of San Carlos.130 There are nine <br />landfills that serve the Redwood City area. Approximately 90 percent of the solid waste collected <br />from Redwood City is sent to the Ox Mountain Sanitary Landfill, located east of Half Moon Bay in <br />unincorporated San Mateo County. The Ox Mountain Landfill is estimated to have a remaining <br />capacity of at least 31 million cubic yards or 80 percent of its total potential capacity.131 While this <br />landfill is currently permitted to operate through January 2018, the closure date is subject to adjust- <br />ment and extension under the direction of Cal Recycle, the State’s waste reduction and management <br />agency. 132 According to Cal Recycle, Ox Mountain Sanitary Landfill has a substantial amount of <br />remaining capacity to continue receiving solid waste from Redwood City and other jurisdictions. The <br />Redwood City 2010 General Plan projects an increase in solid waste generation of about 60 tons per <br />day, which equates to less than 1 percent of the maximum daily throughput accepted at the three <br />largest landfills receiving waste from Redwood City. The City does not require the expansion of any <br />existing landfill under the anticipated growth expected under the General Plan.133 <br /> <br />130 Redwood City, City of, 2010. Redwood City New General Plan, Draft Environmental Impact Report, Section <br />4.15 Utilities. <br />131 Ibid. <br />132 Ibid. <br />133 Ibid. <br /> <br />ATTY/RESO.0032/PC RESO APPROVING CEQA - 860 CHARTER ST. EXHIBIT A <br />REV: 06-15-17 PR <br />Page 116 of 124
The URL can be used to link to this page
Your browser does not support the video tag.