My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC17-07 0032 PC Reso Approving CEQA - 860 Charter St
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2017
>
Reso PC17-07 0032 PC Reso Approving CEQA - 860 Charter St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2017 4:18:31 PM
Creation date
6/28/2017 4:06:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 1: Mitigation Monitoring and Reporting Program <br /> <br />Impact <br /> <br />Mitigation Measures <br />Timeframe for <br />Implementation <br />Responsibility for <br />Implementation <br />Oversight of <br />Implementation <br />III. AIR QUALITY <br />The Bay Area Air Quality <br />Management District <br />(BAAQMD) requires that all <br />projects implement best <br />management practices to reduce <br />construction fugitive dust <br />impacts to a less-than- <br />significant level. <br />AIR-1: The following construction practices shall be <br />implemented at the project site during construction of the <br />project: <br />• All exposed surfaces (e.g., parking areas, staging areas, <br />soil piles, graded areas, and unpaved access roads) shall <br />be watered two times per day. <br />• All haul trucks transporting soil, sand, or other loose <br />material off-site shall be covered. <br />• All visible mud or dirt track-out onto adjacent public <br />roads shall be removed using wet power vacuum street <br />sweepers at least once per day. The use of dry power <br />sweeping is prohibited. <br />• All vehicle speeds on unpaved roads shall be limited to <br />15 miles per hour (mph). <br />• All roadways, driveways, and sidewalks to be paved <br />shall be completed as soon as possible. Building pads <br />shall be laid as soon as possible after grading unless <br />seeding or soil binders are used. <br />• Idling times shall be minimized either by shutting <br />equipment off when not in use or reducing the maximum <br />idling time to 5 minutes (as required by the California <br />airborne toxics control measure Title 13, Section 2485 of <br />California Code of Regulations). Clear signage shall be <br />provided for construction workers at all access points. <br />• All construction equipment shall be maintained and <br />properly tuned in accordance with manufacturer's <br />specifications. All equipment shall be checked by a <br />certified mechanic and determined to be running in <br />proper condition prior to operation. <br />• Post a publicly visible sign with the telephone number <br />and person to contact at the City of Redwood City <br />regarding dust complaints. This person shall respond and <br />take corrective action within 48 hours. <br />During all <br />phases of <br />construction. <br />Project Applicant Redwood City <br />Community <br />Development <br />Director <br />ATTY/RESO.0032/PC RESO APPROVING CEQA - 860 CHARTER ST. EXHIBIT B <br />REV: 06-15-17 PR <br /> <br />Page 2 of 9
The URL can be used to link to this page
Your browser does not support the video tag.