My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC17-08 0033 PC Reso Approving a Conditional Use Permit & ARC - 860 Charter St
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2017
>
Reso PC17-08 0033 PC Reso Approving a Conditional Use Permit & ARC - 860 Charter St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2017 4:12:52 PM
Creation date
6/28/2017 4:08:09 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
6/20/2017
Text box
ID:
1
Creator:
Created:
6/28/2017 4:08 PM
Modified:
6/28/2017 4:08 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXVTRIMFE
ID:
2
Creator:
Created:
6/28/2017 4:08 PM
Modified:
6/28/2017 4:08 PM
Text:
http://www.redwoodcity.org/home/showdocument?id=2002
ID:
3
Creator:
Created:
6/28/2017 4:08 PM
Modified:
6/28/2017 4:08 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH38WASYRE
ID:
4
Creator:
Created:
6/28/2017 4:08 PM
Modified:
6/28/2017 4:08 PM
Text:
http://www.redwoodcity.org/home/showdocument?id=1948
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0033/PC RESO APPROVING A CONDITIONAL USE PERMIT & ARC – 860 CHARTER ST. <br />REV: 06-27-17 PR <br />Page 6 of 11 <br /> <br />4. Mitigation Measures - Provide written documentation of compliance with all required <br />mitigation measures as listed in the approved Rocketship Redwood City Elementary <br />School Project Initial Study/Mitigated Negative Declaration and Mitigation Monitoring <br />and Reporting Program prior to issuance of final certificate of occupancy. <br />[COA][PLANNING] <br /> 5. County Approvals - This approval is not effective until all entitlements are secured <br />with the County of San Mateo. In addition, applicant must comply with any conditions <br />of approval imposed by the County of San Mateo. [COA][PLANNING] <br /> 6. TDM – The applicant shall implement the Traffic Demand Management Plan submitted <br />by Launchpad Development Company dated February 25, 2015 and the Supplemental <br />Traffic Management Plan from Launchpad Development Company dated September <br />30, 2016. The TDM reporting shall include observation of drop-off and pick up activities <br />and observations of school related street parking [COA][PLANNING] <br /> <br />Fees <br /> <br />The following fees must be paid in full prior to issuance of the building permit unless <br />otherwise described below. <br /> 7. Transportation Impact Fee - Pay a Transportation Impact Fee for the net new trips <br />resulting from the proposed project. [SDR] [ENGINEERING] <br /> 8. Water and Sewer Fees – Pay applicable water, recycled water, and wastewater- <br />related fees as outlined on the City’s website. [SDR][ENGINEERING] <br /> 9. Notice of Fees Protest – The applicant may protest any fees, dedications, <br />reservations, or other exactions imposed by the City as part of the approval or as a <br />condition of approval of this development. Per California Government Code Section <br />66020, this 90-day protest period has begun as of the date of the approval of this <br />application. [SDR][OFFICE OF THE CITY ATTORNEY] <br /> <br />Landscaping and Site Improvements <br /> 10. Water-Efficient Landscaping – Provide a landscaping and irrigation plan <br />conforming to the California Water-Efficient Landscape Ordinance (AB 1881), including <br />an automatic irrigation system (drip, micro-spray, or bubblers) with a rain sensor, <br />and show these measures on the building permit plans. [COA][PLANNING] <br /> 11. Stormwater Runoff - Post-construction runoff into the storm drain shall not exceed <br />pre-construction runoff levels. The applicant’s design professional shall evaluate the <br />project’s impact to the City’s storm drainage system and shall substantiate their <br />conclusions with drainage calculations to the satisfaction of the City Engineer. The <br />project shall be designed in conformance with the Drainage Guidelines for <br />Commercial Development. [SDR] [ENGINEERING] <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.