My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 Trip Stop Sidewalk Repair Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Under 60K
>
Agmt17 Trip Stop Sidewalk Repair Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2017 3:15:08 PM
Creation date
6/29/2017 3:14:51 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Trip Stop Sidewalk Repair Inc.
PROJECT NAME
Sidewalk offset cutting
RMP File Number
304.5
Date
6/29/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br />Scope of Work/ Tasks <br />Contractor will furnish all labor, materials, tools, equipment and incidentals to perform concrete <br />sidewalk offset cutting. This work includes: <br />1. Mobilization and demobilization at project sites; <br />2. Surveying project sites; <br />3. Traffic control (as needed); <br />4. Concrete cutting of sidewalk offsets measuring over 3/4" and below 2"; <br />5. Reporting locations of all sidewalk offsets needing removal and replacement to the City, <br />6. Reporting details of all sidewalk offsets addressed, including location, address, date, <br />description, height of offset, length of offset, and calculated cost; <br />7. Site clean-up. <br />Invoicine <br />Contractor will submit monthly invoices to: Public Works Services Department, Attn: Public <br />Works Superintendent - ROW, 1400 Broadway Street, Redwood City, CA 94063. <br />California State Contractor's License <br />Contractor shall maintain for the duration of the Agreement and any and all amendments, an <br />active contractor's license from the California Contractor's State License Board related to <br />concrete services. <br />2. Payment Terms <br />The total not to exceed contract amount is $50,000. Fees will be billed based on the actual per <br />inch foot of sidewalk offset removed at each work site at the rate of $18.00 per inch foot of <br />sidewalk offset. <br />Method of Measurement and Payment <br />Inch -feet shall be calculated by multiplying the average depth of the cut on each sidewalk offset <br />by the length along the joint that is cut. <br />Example: If a joint is cut 1" on one side and tapered to 0" on the other side of a full 4 -foot width <br />of the sidewalk, it shall be calculated as follows: <br />1" + 0" x 4' = Total inch -feet <br />2 <br />Average x width = Total inch -feet <br />Inch -feet x cost per inch foot = Total price for sidewalk offset <br />REV: 06-23-17 MI <br />Page 6 of 7 <br />ATTY/AGR.2017.147/Trip Stop Sidewalk Repair Inc - Sidewalk Offset Cutting <br />
The URL can be used to link to this page
Your browser does not support the video tag.