My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 Trip Stop Sidewalk Repair Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Under 60K
>
Agmt17 Trip Stop Sidewalk Repair Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2017 3:15:08 PM
Creation date
6/29/2017 3:14:51 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Trip Stop Sidewalk Repair Inc.
PROJECT NAME
Sidewalk offset cutting
RMP File Number
304.5
Date
6/29/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract price paid per inch -foot of sidewalk offset includes full compensation for famishing all <br />labor, materials, tools, equipment and incidentals, including clean-up work, and for doing all <br />work involved in reporting locations of all sidewalk offsets by address and the inch -foot quantity <br />per location, as described in these specifications and details, and as directed by the City. <br />No separate measurement payment shall be made for mobilization. Full compensation for <br />furnishing all labor, materials, tools, equipment and incidentals, and for doing all work involved <br />in surveying the designated areas, reporting locations of all sidewalk offsets by address that <br />require removal and replacement, and providing traffic control as required in these specifications <br />and details, and as directed by the City, shall be considered included in the various items of <br />work, and no additional compensation will be allowed. <br />REV: 06-23-17 MI <br />Page 7 of 7 <br />ATTY/AGR.2017.147/Trip Stop Sidewalk Repair Inc - Sidewalk Offset Cutting <br />
The URL can be used to link to this page
Your browser does not support the video tag.