<br />HI Camino Real Traffic .J£gnaI System City of Redwood City <br />However, should a complete modification of the existing PSR and PR be required, Meyer Mohaddes is <br />prepared to complete that work within the scope and budget presented in this proposal. Should a complete <br />resubmittal be required, Meyer MoM~ Associates recommends that it be processed as a combined PSRJPR <br />under the recent guidelines issued by Calttans. <br />TASK 4: PS&E <br />The plans and specifications for various elements of the system will be prepared to satisfy the required <br />functions and criteria specified during the previous tasks. The final bid package will include all necessary <br />improvements to be performed by contractor for a complete and operational system. The primary elements <br />which we would concentrate on during this task are: <br /> Software <br /> Hardware <br /> Communication <br />The system software specifications will address the architecture, operating system, compatibility, and <br />expansion capability. The system hardware specifications will address signal system controllers at individual <br />intersections and other field or central equipment needed to be included in the PS&E package. <br />The design sub-tasks include the following: <br />4.1 30 Percent Plans <br />MMA will prepare 30 percent plans for review and approval by the City, Caltrans, as appropriate. The 30 <br />percent plans will show final design of the interconnect system, including intersection drawings, cabinet and <br />equipment detail. The hardwire interconnect drawings will be prepared at a scale of 1 :500 (metries) and the <br />intersection details for wireless interconnect locations will be prepared at a scale of 1:200 (metric). In <br />addition, prior to procPl"liing with preparation of any plans, we will contact Caltrans staff to obtain their input <br />for appropriate scale to be used, since the standards are still being finalized at the present time. <br />4.2 60 Percent Plans <br />MMA will prepare 60 percent plans for review and approval by the City, Caltrans, as appropriate. The 60 <br />percent plans will include all drawings required for construction, and ordering the equipment, including <br />preliminary initial cost estimates. <br />4.3 90 Percent PS&E <br />MMA will prepare 90 percent plans for review and approval by the City, Caltrans, as appropriate. The 90 <br />percent plans will include 60 percent plans updated in response to comments from the City, technical <br />specifications, and cost estimate. The PS&E will be prepared in conformance with current edition of Calttans <br />Guide for Submittal of Plans, Specifications, and Estimates, Standard Plans, and Standard Specifications. We <br />will provide specific provisions for work included in the pJans that are not described in the Calttans guidelines. <br /> Meyer, Mohaddes Associates, Inc. <br /> 30 <br /> 'r" <br />