My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-07-24 Closed and Joint SA FPA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-07-24 Closed and Joint SA FPA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:52:47 PM
Creation date
7/20/2017 4:36:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
7/24/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
500
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.3.C. - Page 116 <br />Table B-4 <br />TOTAL COMPENSATION <br />VSA CONSULTING ENGINEERS <br />....... - ---- . .... ........... .................. <br />CONTRACT PRICING PROPOSAL <br />Proposer: f <br />V&A Consulting Engineers <br />DETAIL DESCRIPTION OF COST ELEMENTS: <br />,Corrosion Testing/Recommendations: As -needed consultation based on Caltrans corrosion <br />requirements for bridge replacement structures and associated approach embankment walls at the <br />1101/Woodside interchange reconstruction project for the City of Redwood City. Tasks may include <br />I document review, field soil resistivity testing, soil corrosivity report with corrosion control <br />-recommendations, technical assistance, and project management. <br />1. DIRECT LABOR (Specify) Estimated Hours) Rate/Hour <br />Estimated Cost ($) <br />Principal in Charee (G. Willson) <br />$79.33 <br />093.30 <br />Sr. Project Manager (C. Sheldon) <br />J. 69.71 <br />5278.84 <br />Project Manager (C. Teall) <br />3_4 $59.62 <br />$1,907.8 <br />Associate Engineer (M. Snow) <br />48$38.46 <br />$1,846.08 <br />Assistant Engineer (M. Tam) <br />24 $39.66 <br />$951.84 <br />E9pi1WRrj9.g Assistant (W. Pester) <br />7 S27,88 <br />555,7a <br />Engineering Assistant T. Lam) <br />8) $48.08. <br />$384.64 <br />SUBTOTAL <br />$C, 1� 8.301 <br />219.200% OVERHEAD <br />$131!;30.51 <br />ITOTAL.LABOR <br />$191848.81. <br />10.000% FEE <br />$1,984.88 <br />TOTAL PRIME <br />$21,833.69 <br />4. SUBCONSULTANT COSTS _ <br />$0.00 <br />5. OTHER DIRECT COSTS <br />5441.31 <br />TruckS85/day$85 <br />00 <br />Mileage $0.535/mile <br />.... .................... <br />$42.80 <br />Office and Field Expenses (est.) <br />$313.51 <br />6.TOTAL <br />TOTAL <br />$22,275.00 <br />ESTIMATED <br />COST W/FEE <br />Page 72 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PS&E <br />
The URL can be used to link to this page
Your browser does not support the video tag.