Laserfiche WebLink
6.3.C. - Page 117 <br />Table B-5 <br />TOTAL COMPENSATION <br />WRECO, INC. <br />CONTRACT PRICING PROPOSAL <br />Proposer: <br />WRECO <br />DETAIL DESCRIPTION OF COST ELEMENTS. <br />Prepare HydroMod Memo, SWDR, & Drainage Report for 101/Woodside Interchange Project <br />1. DIRECT LABOR (Specify) I Estimated Hours Rate/Hour Estimated Cost ($) <br />Principal Engineer <br />1; <br />$91.68 <br />$1,100.16 <br />Supervising Engineer <br />4§ <br />$75.79 <br />53,637.92 <br />Senior Engineer II <br />74 <br />$68.53 <br />55,208.28 <br />Senior Engineer 1 <br />72 <br />$51.39 <br />$3,700.08 <br />Associate Engineer <br />20QWAS <br />„ ,........— , . , <br />$8,230.00 <br />Staff Engineer <br />180 <br />$34.99 <br />$6,298.20 <br />Senior Technician <br />7Ey <br />$37.03 <br />$2,814.28 <br />Tech Editor/Clerical <br />1§ <br />$28.81 <br />$460.96 <br />SUBTOTAL <br />$31,449.88 <br />134.970% <br />OVERHEAD <br />$42,447.90 <br />TOTAL LABOR <br />$73,897.78 <br />10.000% <br />FEE <br />$7,389.78 <br />TOTAL PRIME <br />$81,287.56 <br />4. SUBCONSULTANT COSTS <br />.... ......—.. _.. <br />S. OTHER L/11tCLI LOSTS (misc travel, print, postage) $2,852.00 <br />6. TOTAL TOTAL <br />$84,139.56 <br />ESTIMATED <br />COST W/FEE <br />Page 73 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PS&E <br />