My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt95 Vanir Construction Manag
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1995
>
Agmt95 Vanir Construction Manag
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:31:22 PM
Creation date
11/9/2004 10:47:07 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Vanir Construction Management
PROJECT NAME
professional services - project manager for Sandpiper Park joint use
RMP File Number
304
Date
12/1/1995
Reso Ref
12567
MO Ref
97-054 97-202 98-140 98-298
Task Order
Yes
Box
5860
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> - <br /> 2.3.3 Cost Analvsis: The Project Manager shall analyze and report to the <br /> City/District and the Design Professional the cost of various design <br /> and construction alternatives. As a part of the cost analysis, the <br /> Project Manager shall consider costs related to efficiency, usable <br /> life, maintenance. energy and operation. <br /> 2.4 Manaqement Information System (MIS) <br /> 2.4.1 Establishina the Project MIS: The Project Manager shall develop a <br /> MIS to assist In establishing communications between the <br /> City/District, Project Manager, Design Professional, Contractor and <br /> other parties on the Project. In developing the MIS, the Project <br /> Manager shall interview the City/District's key personnel and others <br /> in order to determine the type of information to be managed and <br /> reported. the reporting format, the desired frequency for distribution <br /> of the various reports, the degree of accessibility by potential users, <br /> and the security protocol for the system. <br /> 2.4.2 Desiqn Phase Procedures: The Project Manager shall prepare <br /> procedures for reporting, communications and administration during <br /> the Design Phase, for approval by City/District. <br />3. Desian Phase <br /> 3.1 Proiect Manaaement <br /> 3.1.1 Revisions to the Project Manaaement Plan: During the Design <br /> Phase the Project Manager shall make recommendations to the <br /> City/District regarding revisions to the Project Management Plan. <br /> Revisions approved by the City/District shall be incorporated into the <br /> Plan by the Project Manager and the Plan shall be re-submitted to <br /> the City/District for review and acceptance. <br /> 3.1.2 Desian Kick-Off Meetina: At the start of the Design Phase, the <br /> Project Manager shall conduct a Project Conference attended by the <br /> Design Professional, the City/District and others. During the <br /> meeting, the Project Manager shall review the Scope of the Project. <br /> the Project Management Plan, the Master Schedule, the proposed <br /> Design Phase Milestone Schedule, the Project and Construction <br /> Budget and the MIS. <br /> 3.1.3 Desian Phase Information: The Project Manager shall monitor the <br /> Design Professional's compliance with the Design Schedule, Project <br /> Management Plan, and Design Phase Procedures; and the Project <br /> Manager shall coordinate and expedite the flow of information <br /> between the City/District. Design Professional and others. <br /> Page 3 of 15 <br /> -,,-"~-, ....., .," . <br />