My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt95 Vanir Construction Manag
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1995
>
Agmt95 Vanir Construction Manag
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:31:22 PM
Creation date
11/9/2004 10:47:07 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Vanir Construction Management
PROJECT NAME
professional services - project manager for Sandpiper Park joint use
RMP File Number
304
Date
12/1/1995
Reso Ref
12567
MO Ref
97-054 97-202 98-140 98-298
Task Order
Yes
Box
5860
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> .. <br /> between the City/District and Contractor shall be only by change <br /> orders executed by the City/District. <br /> 5.1.6 Record Drawinas. Operation and Maintenance Materials: As <br /> required by the Contract Documents, the Project Manager shall <br /> receive from the Contractor As-Built record drawings, operation and <br /> maintenance manuals, warranties and guarantees for materials and <br /> equipment installed on the Project, and review such documents for <br /> completeness and submit documents to the City/District. <br /> 5.1.7 Substantial Completion: In consultation with the Design <br /> Professional and City/District's inspectors (when applicable), the <br /> Project Manager shall review the contractor's request for substantial <br /> completion and final completion and recommend to the City/District <br /> when the Project and the Contractor's Work has achieved <br /> substantial and final completion. The Project Manager shall, prior to <br /> issuing a Certificate of Substantial Completion, compile a list of <br /> incomplete work which does not conform to the Contract Documents <br /> based on input from the Design Professional and City/District's <br /> inspectors (when applicable). This' list shall be attached to the <br /> Certificate of Substantial Completion. The Project Manager shall <br /> issue the Certificate of Substantial Completion and Certification of <br /> Final Completion to the Contractor. <br /> 5.1.8 Final Payment: In consultation with the Design Professional and <br /> City/District's inspector (when applicable), the Project Manager shall <br /> provide to the City/District a written recommendation regarding final <br /> payment to the Contractor. <br />5.2 Time Manaaement <br /> 5.2.1 Master Schedule: The Project Manager shall adjust and update the <br /> Master Schedule and distribute copies to the City/District and <br /> Design Professional. Recommendations for such adjustments to the <br /> Master Schedule shall be made to the City/District, and upon <br /> City/District's approval shall be incorporated by the Project Manager. <br /> 5.2.2 Contractor's Construction Schedule: The Project Manager shall <br /> review each Contractor's Construction Schedule and shall verify that <br /> the schedule is prepared in accordance with the requirements of the <br /> Contract Documents and that it establishes completion dates that <br /> comply with the requirements of the Contract Documents. If changes <br /> in the Master Schedule maintained by the Project Manager are <br /> appropriate, the Project Manager shall make such modifications as <br /> approved by the City/District. <br /> Page 10 of 15 <br /> -*" .-.-....-. <br />
The URL can be used to link to this page
Your browser does not support the video tag.