<br />Brian Lee <br />October 1, 1996 <br />Page 5 <br />1. The environmental document. <br />2. Establishment of the street right of way. <br />3. Any right of way work including easements, except for the McKinley School. <br />4. Geotechnical work. City to provide required soils engineering recommendation. <br />5. Any traffic counts and the determination of the traffic index (T.!.) <br />6. Any Arborist work associated with existing trees. <br />7. Reproduction (except for check prints) to be reimbursed in addition to above estimated <br /> fees. <br />8. Hydrology Studies of existing storm drainage system. Hydraulics limited to new cross <br /> laterals. <br />9. Potholing existing facilities. <br />10. Services during construction. Contractor to be responsible for on-site job conditions <br /> including safety. <br />II. Changes to previously approved work or changes caused by change in approved criteria. <br />12. Any work which is not specifically covered in the scope of work. <br />Work required for any of these items will be done by others, or, at the discretion of the City, by <br />Wilsey & Ham as extra work. <br />Schedule <br />Attached is a proposed schedule that will meet the City's desired timing for the project. <br />Fee <br />Attached is a spreadsheet by task of the foregoing fee estimate. <br /> Page 5 of 6 B:\UJB.WPD <br /> @ <br />.._~ _...... ' "-".".."."""..._...."".._,, ,......------,.....1"'--."....''..............., <br />