Laserfiche WebLink
pump station that is constructed in a separate or subsequent construction <br />contract. <br />2. Consultant shall respond to questions from prospective bidders. Consultant <br />shall assist in issuing addenda, as directed by the City. <br />3. Consultant shall attend and conduct pre -construction meeting. <br />4. Consultant shall conduct three (3) site visits during construction at appropriate <br />stages. <br />5. Consultant shall review shop drawings submittals (45), change order requests, <br />requests for information (12), and provide written recommendations to the <br />City. <br />6. Consultant shall participate in the final inspection and assist with punch list of <br />deficiencies. <br />7. Consultant shall prepare "As -Built" drawings based on construction field notes <br />and limited field review by the Consultant. <br />Deliverables: <br />• Construction package to be determined by the City Engineer — One (1) hard <br />copy set of the one hundred percent (100%) plans (24"x36" plan sheets), one <br />(1) hard copy of the specifications, Engineer's Estimate and probable <br />construction schedule plus electronic copies (AutoCAD, PDF, Word, Excel, etc.) <br />shall be submitted and presented by the Consultant to the City. The Contract <br />Document set shall bear the responsible engineer's wet stamp and signature <br />with a license expiration date. <br />• One (1) set of full-size (24x36) as -built plans on 4 -mil polyester media shall be <br />submitted by the Consultant and provide Electronic copies (AutoCAD, PDF, <br />Word, Excel, etc.) of final specifications, cost estimate and plans. <br />TASK 9—OPTIONALADDITIONAL SERVICES <br />Additional services shall be determined by the City and agreed upon by both the <br />City and the Consultant. The tasks may include, but are not limited to the following: <br />1. Consultant shall prepare an Operations and Maintenance manual for the project. <br />2. Consultant shall perform Warranty Inspections for the project. <br />Deliverables: <br />Deliverables to be determined. <br />ATTY/AGR/2017.149/HYDROSCIENCE ENGINEERS, INC. <br />REV: 06-30-17 PR <br />Page 17 of 20 <br />