My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt95 ETo Limited
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1995
>
Agmt95 ETo Limited
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:28:15 PM
Creation date
11/16/2004 11:02:43 AM
Metadata
Fields
Template:
Agreement
Contractor Name
ETo Limited
PROJECT NAME
consulting - water allocation program
RMP File Number
304
Date
4/14/1995
Reso Ref
12400
Box
5854
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ETo Limited Vl ater Allocation Program <br />Task 5 Transfer customer databases - Provide for transfers of existing customer <br />databases to W AP tables. <br />Task 6 Evaluate City data resources pertinent to determining customer landscaped area. <br />Task 7 Create survey form - Define data requirements, design and print survey forms. <br />Task 8 Installation - Install \\TAP on General Services computers. <br />Task 9 Documentation - Provide documentation of Vl AP operational procedures and <br />features. Includes both printed and on-line help. <br />Task 10 Training - Provide training and assistance for General Services Staff during <br />initial phase of project (3 months). <br />Data Collection <br />Task 11 Assemble mailing list - Create mailing list (by meter and customer) ifsurvey <br />mailing goes out under separate cover. Approximately 22,000 customers would require <br />survey forms. <br />Task 12 ìv1ail survey to customers - Mail either with the normal billing sequence or as <br />separate mailing. <br />Task 13 Data entry - Enter data from returned survey forms into database. Automation <br />of this step is possible. <br />Task 14 Verify data - Using software tests and spot checks verify data (the latter <br />performed by General Services personnel). <br />Task 15 Generate initial allocations - Calculate allocations, print out and mail back <br />verification letters to customers. <br />Redwood Ci ty - 4- General Services Department <br /> ,._-,-,.~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.