My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 Engineering Solutions Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Under 60K
>
Agmt17 Engineering Solutions Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2017 3:45:43 PM
Creation date
8/16/2017 3:45:18 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Engineering Solutions Services, Inc.
PROJECT NAME
Assist with Green Project Reserve (GPR) grant funding for 2 projects, Water Meter Upgrade and Water Recycling Expansion projects
RMP File Number
304.5
Date
8/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Thorough discussions of reasoning for selection of the chosen <br />alternative for the project <br />3. Preparation of the Technical Application package including all required <br />attachments, such as: <br />a. Technical Report consisting of hydrology, hydraulics, geology, <br />development trends, capacity and existing conditions, proposed <br />improvements, permitting, alternative analysis, life cycle analysis, energy <br />efficiency, compliance with water quality requirements, and several other <br />topics <br />b. Climate Change Worksheet consisting of Vulnerability, Adaptation and <br />Mitigation discussions <br />4. Identification of all eligible elements for GPR funding and preparation of business <br />cases and justification reports for each element <br />5. Financial Application Package including details about City's connection, current <br />rates, revenues and debt obligations <br />6. Assistance in preparation of resolutions for authorization of binding the agency, <br />identification of a revenue source for reimbursement <br />7. Correspondence and coordination with the State project managers for <br />environmental, technical and financial divisions <br />8. Establish an account for the agency and upload all the backup documents and <br />various attachments of each application based on State's specific naming <br />protocols to the Financial Assistance Application Submittal Tool (FAAST). <br />9. Coordination to finalize the state processes to make sure the project is listed on <br />the funding priority list for funding <br />REV: 07-25-17 MI Page 10 of 13 <br />ATTY/AGR.2017.169 /Engineering Solutions Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.