Laserfiche WebLink
<br />September 27, 2004 <br />Stephen 1. Harrison - Project Engineer <br />Community Development Services <br />Engineering & Construction <br />Page 2 of3 <br />- Survey stationing will be provided as recommended by the City. <br />- Contours will be indicated at a one-foot interval. <br />- Redwood City elevation datum will be used (as supplied by City) <br />PROJECT FEES AND MAN-HOURS - The following personnel (with abbreviations) <br />will provide services for the project: <br />- Principal PR <br />- Two-Person Survey Crew SC <br />- Project Surveyor PS <br />- Surveying Technician ST <br />- CAD Drafter CAD <br />The following tasks will be required to provide the final plans. Below each task is an <br />estimate ofthe man-hours required for that task keyed to the personnel listed above. <br />- Right-of-way, bench mark, property line & utility line research <br /> ST: 4 hrs. <br />- Field topographic surveying <br /> SC: 32 hrs. <br />- Computer processing of field data into AutoCAD format and processing of <br /> City Block Book information. <br /> PS: 4 hrs. <br />- AutoCAD drafting: <br /> CAD: 56 hrs. <br />- Project management, quality control, and plan checking. <br /> PR: 8 hrs. <br /> PS: 8 hrs. <br />Based upon the attached Standard Fee Schedule, the fee for our services will be <br />$12,800.00. <br /> "____..,. ·-__"'····_·_·_~_,_____~__._.__~____".__..__.,_____~__u.,_ <br />