My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 AECOM Technical Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 AECOM Technical Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 3:14:29 PM
Creation date
8/23/2017 1:00:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
AECOM Technical Services, Inc
PROJECT NAME
101/84 PS&E
RMP File Number
701
Date
8/21/2017
MO Ref
17-148 22-106 23-027
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Work Tasks <br />Task 1: Draft Analysis — The following subtasks will be conducted. <br />a. Define critical stage construction and traffic handling layouts and study traffic <br />volumes. <br />a. Translate intersection volumes into refined Synchro networks for each <br />stage. The analysis network will include the following intersections. <br />i. Blomquist Street/Seaport Boulevard <br />ii. 101 NB Ramps/Woodside Road* <br />iii. 101 SB Ramps/Woodside Road* <br />iv. Veterans Boulevard/Woodside Road <br />v. Broadway/Woodside Road <br />vi. Bay Road/Woodside Road <br />vii. Veterans Boulevard/Chestnut Street <br />viii. Broadway/Chestnut Street <br />*New Intersections <br />b. Refine previously derived source volumes for lane closure analysis to reflect <br />current stage construction and traffic handling layouts. <br />b. Analyze intersections along Woodside Road/Seaport Boulevard from Bay Road to <br />Blomquist Street with modified geometry for each stage. Summarize intersection <br />level of service, queue and travel time for existing and modified lane geometry. <br />Define feasible mitigations for critical movements. <br />c. Analyze lane closure requirements and document findings. <br />d. Prepare draft memorandum and distribute to Caltrans and City for review. <br />e. Meet with Caltrans and City to discuss findings and determine feasible mitigations <br />to test. <br />Task 2: Revised Analysis - The following subtasks will be conducted. <br />a. Define and test feasible mitigations identified in Task 1 using the measures of <br />effectiveness listed in Task 1a through Task 1c. <br />b. Prepare draft memorandum and distribute to Caltrans and City for review. <br />c. Meet with Caltrans and City to discuss findings and define necessary analysis <br />refinements to complete the study. <br />Task 3: Final Analysis and Report - The following subtasks will be conducted. <br />REV: 02-05-20 PR <br />ATN/AGR.Amend. No.4/AECOM (Page 4 of 7) <br />
The URL can be used to link to this page
Your browser does not support the video tag.