Laserfiche WebLink
• Description and figures of the sampling locations, depths of samples to be <br />collected, frequency of sampling, and other procedures, such as use of Terra <br />Cores® for sampling for volatile compounds. <br />• Description of the analytical procedures to be used. <br />• Detailed sampling and analysis table to facilitate the field efforts and to minimize <br />the potential for field errors. <br />AECOM will implement the approved work plan as follows: <br />• AECOM will use the Site-specific Project Health and Safety Plan for its <br />fieldwork. <br />• AECOM will work safely with field crews and subcontractors that have <br />experience working in the Caltrans Right -of -Way and in accordance with the <br />project's Caltrans encroachment permit. All personnel will have 40 -hours <br />HAZWOPER training and required updates. Proper personal protective <br />equipment will be worn by all staff during the fieldwork. <br />• AECOM and its subconsultant(s) will develop a traffic control plan to be used <br />during the field work for review and approval by Caltrans. <br />• Soil and groundwater sampling will be conducted with a direct push rig to <br />minimize field time and waste generation. Sampling equipment will be <br />decontaminated between each sampling event. <br />• AECOM staff will use preprinted labels and chain -of -custody forms to minimize <br />the potential for field errors. <br />• The samples will be maintained under AECOM chain of custody until transferred <br />to the lab courier. <br />• AECOM will use a California -certified lab for the analyses. <br />• Analytical data will be reviewed by trained AECOM staff for QA/QC, and the <br />data will be flagged in the data tables, if needed. <br />• Waste soil from AECOM borings and decom water from the equipment cleaning <br />will be drummed and left at a Caltrans -designated on-site location until sampled, <br />analyzed, characterized and profiled for off-site disposal to a designated licensed <br />landfill. AECOM assumes that Caltrans will provide a valid, active EPA ID <br />number and sign hazardous waste manifests for off-site soil disposal of hazardous <br />soils in a hazardous waste landfill, if the soils are characterized as hazardous. <br />• Off -Site disposal of the investigation wastes and disposal loading oversight are <br />included in this scope of work. AECOM will use a licensed hazardous waste <br />Page 24 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 ME <br />