Laserfiche WebLink
• AECOM will review Caltrans' Standard Specifications dated 2015 or latest edition, <br />and Caltrans' Standard Special Provisions (SSP) applicable thereto. <br />• For all work items necessary for construction of the Project, AECOM will assemble <br />data and prepare drafts of (1) necessary edits to the SSP, and (2) modifications to the <br />SSP or additional nonstandard specifications (NSSP) which may be necessary. <br />Caltrans will prepare the "boiler plate" special provisions. <br />• AECOM will submit and work with Caltrans to gain approval of nonstandard special <br />provisions, if any. <br />• Upon completion of the foregoing activities, AECOM will submit the SSP signature <br />and seal sheet. <br />• AECOM will coordinate specifications with other design consultants to assist design <br />interface activities. SSP will be submitted in MS Word format. <br />Task 3.8 Design Reports <br />AECOM will update and submit the design reports that were not approved previously under <br />Task 2.6. The updates will incorporate all the agreed upon comments from the CITY, <br />Caltrans and other agencies. <br />Task 3.9 Quantities and Cost Estimate <br />AECOM will develop the estimate of Construction Quantities and Cost Estimates. This will <br />include back-up calculations. The estimate will follow the Caltrans format. <br />Task 3.10 Construction Schedule <br />AECOM will prepare a Preliminary Construction Schedule for the Project based on the data <br />developed in Task 3. The schedule will be prepared using Microsoft Project. <br />AECOM will coordinate mitigation, highway and structures construction schedule <br />information to prepare the Project Construction Schedule. <br />Task 3.11 Permits <br />AECOM will draft a required "Application for 401 Water Quality Certification and/or Report <br />of Waste Discharge" for review by the Caltrans Project Development Office. The 65% PS&E <br />submittal will be used in preparing the following submittal. <br />The application will be prepared by AECOM, but Caltrans must ultimately sign and submit it <br />because the State owns and operates their right-of-way. Caltrans will officially transmit the <br />application to the appropriate agency. Work in non -State parcels must involve the local <br />agency. Unless otherwise noted, AECOM deliverables for this task include one draft and one <br />final of the Water Quality Certification application, with two hard copies and one electronic <br />copy per submittal. The following summarizes the anticipated approach: <br />San Francisco RWOCB Section 401 Water Oualitv Certification and/or Ren_ ort of Waste <br />Discharge ADDlication <br />The IS/EA identified a total impact of 0.02 acre of non jurisdictional waters of the State, <br />consisting of drainage ditches located along Woodside Road and Veterans Boulevard near <br />Broadway, and Veterans Boulevard near Chestnut Street. The project would not affect US <br />Page 39 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PS&E <br />