My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 AECOM Technical Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 AECOM Technical Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 3:14:29 PM
Creation date
8/23/2017 1:00:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
AECOM Technical Services, Inc
PROJECT NAME
101/84 PS&E
RMP File Number
701
Date
8/21/2017
MO Ref
17-148 22-106 23-027
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 3.15 Constructability Review <br />AECOM will participate in a Constructability Review at the 65% submittal. It is assumed <br />that the CITY and Caltrans will provide a representative to conduct the Constructability <br />Review. AECOM will coordinate the Constructability Review meetings. AECOM will <br />prepare meeting notes summarizing the action items and will adequately address the <br />comments generated by the review including providing explanation for comments not <br />incorporated into the design. <br />Task 3.16 Public Meeting Support <br />AECOM will provide support to the City by having one person attend a public meeting with <br />project exhibits and will provide talking points prior to the meeting. <br />Task 3 Deliverables <br />• Design Exception List (if required) <br />• Bridge Site Data Submittal <br />• Type Selection Report <br />• Right of Way Requirements <br />• Design Plan Sheets (65%) <br />• Edits and Modifications to the Special Provisions and NSSP's (65%) <br />• Final Design Reports (Refer to Task 2 for complete list of reports) <br />• Quantity Estimate <br />• Construction Cost Estimate <br />• Construction Schedule <br />• RWQCB Water Quality Certification application <br />• Construction General Permit Compliance documents <br />• Draft PS&E Forms <br />• Constructability Review Meeting Notes <br />• Public Meeting Exhibits and Talking Points <br />• Electronic files of plan sheets submitted <br />TASK 4 95% PS&E PHASE <br />Prior to making submittals of the 95% PS&E documents, AECOM will address the comments <br />received from the 65% submittal and incorporate them as appropriate. This will include <br />resolving them with Caltrans and its functional units, Caltrans' Engineering Services, the City, <br />and other reviewing agencies by attending up to 3 comment resolution meetings. AECOM will <br />provide written response to the 65% PS&E review comments, with justification noted for each <br />comment not incorporated. <br />Page 41 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101184 PS&E <br />
The URL can be used to link to this page
Your browser does not support the video tag.