Laserfiche WebLink
Task 4.8 Draft PS&E Forms <br />AECOM will update the Draft PS&E Forms submitted in Task 3 and complete the documents for <br />final review. AECOM will also prepare the following Draft Forms: <br />• Quality Control Certification of First Submittal to DOE <br />• First Submittal to DOE Checklist <br />Task 4.9 QC Review <br />AECOM will perform an in-house Final 95% PS&E QC review. <br />Task 4.10 Independent Design Check - Structures <br />An independent check of the bridge structures and non-standard retaining walls utilizing the <br />unchecked details (65%), the design criteria, the Foundation Reports and other pertinent reports <br />and information will be performed. An independent set of checker's calculations to verify the <br />design of all the plan details will be developed. The checker will be responsible for developing <br />an independent set of quantity calculations. <br />Check calculations shall include analysis and computations that are necessary to independently <br />check all aspects of the design shown on the unchecked details. Results from the check <br />calculations shall be compared with the design. Discrepancies shall be resolved between the <br />designer and checker and the resolutions documented in the calculations. <br />Task 4 Deliverables <br />• Design Exception Fact Sheets <br />• Design Plan Sheets <br />• Special Provisions <br />• Design Reports not previously approved <br />• Permit Application and Permit <br />• Quantity Estimate <br />• Construction Cost Estimate <br />• Construction Schedule <br />• Draft PS&E Forms <br />• Design Calculations <br />• Quantity Calculations <br />• Final Materials Report <br />• Final Foundation Report <br />• Independent Design Check Calculations (Structures) <br />• Independent Quantity Check Calculations (Structures) <br />• Response to 65% PS&E Comments <br />• Electronic files of plan sheets submitted <br />Page 43 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PS&E <br />