My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 AECOM Technical Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 AECOM Technical Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 3:14:29 PM
Creation date
8/23/2017 1:00:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
AECOM Technical Services, Inc
PROJECT NAME
101/84 PS&E
RMP File Number
701
Date
8/21/2017
MO Ref
17-148 22-106 23-027
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Preconstruction surveys: Proposed survey approach for nesting birds, bat activity and <br />salt marsh harvest mouse will be developed. <br />• Construction monitoring: Requirements for monitors during construction will be <br />developed. This would cover nesting birds (prior to each nesting season) and salt marsh <br />harvest mice. <br />Worker education program: The worker training with regard to environmental <br />requirements will be developed. This will include an outline of the training approach, <br />schedule, requirements, and handouts. <br />Task 5.5 Resident Engineer's File <br />AECOM will prepare and submit a Resident Engineer's (RE) file in accordance with Caltrans' <br />requirements and include project relevant items identified in the Resident Engineer's file check- <br />off list. <br />The items that will be included in the RE file will be per Appendix GG — Project Data Checklist <br />of the PDPM and Section 4-9 of the OSFP Information and Procedures Guide. <br />Task 5.6 Combining Highway/Structure PS&E <br />AECOM will combine the (100%) Structures Plans, approved by Caltrans Engineering Services, <br />with AECOM's final (100%) Highway PS&E documents into a single construction contract <br />package. Combination will include the following: <br />• PS&E documents <br />• Right-of-way and utility relocation requirements and review of right-of-way certification <br />documents <br />• Preparation of lane closure charts with traffic study backup <br />• Updated Construction Schedule <br />Consistency between design documents will be checked for the final time prior to submittal to <br />the City and Caltrans. The combination process will be performed at least one week prior to the <br />Task 5 submittal. <br />Task 5.7 PS&E Forms and Approvals <br />AECOM will update the Draft PS&E Forms submitted in Task 4 and complete the documents for <br />final review. AECOM will also prepare the following PS&E Forms and obtain approvals: <br />• Construction Contract Submittal Memorandum <br />• Combined Basic Engineering Estimate System (BEES) <br />• Project Information Form <br />• Quality Control Certification of First Submittal to DOE <br />• 100% PS&E Submittal to DOE Checklist <br />• TMP Checklist <br />• Non -Standard Special Provision (NSSP) Status List <br />• NSSP — Concurrence and Approval <br />Page 45 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101184 PS&E <br />
The URL can be used to link to this page
Your browser does not support the video tag.