My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 AECOM Technical Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 AECOM Technical Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 3:14:29 PM
Creation date
8/23/2017 1:00:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
AECOM Technical Services, Inc
PROJECT NAME
101/84 PS&E
RMP File Number
701
Date
8/21/2017
MO Ref
17-148 22-106 23-027
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Construction Schedule <br />• Design Reports not previously approved <br />• PS&E Forms/Approvals <br />• Response to 95% PS&E Comments <br />TASK 6 FINAL PS&E PHASE (CALTRANS DISTRICT & HQ REVIEW) <br />Task 6 consists of incorporating comments received from Caltrans' District 4 Final Review on <br />the Task 5 submittals and updating the Resident Engineer's file. <br />AECOM will coordinate with subconsultants and update Project documents as required. <br />Task 6.1 Bid Documents <br />AECOM will incorporate the comments received from the City and Caltrans' District 4 Final <br />Review submittal. <br />Task 6.1.1 Caltrans District Review AECOM will incorporate responses to comments <br />and changes as a result of the Caltrans District Engineer processing. <br />Task 6.1.2 Caltrans Headquarters Review AECOM will incorporate responses to <br />comments and changes as a result of the Caltrans Headquarters (DES -OE) processing. <br />Task 6.2 Resident Engineer's File <br />AECOM will update the Resident Engineer's File, to add items required for highway work and <br />will update structure design information, if required. <br />Task 6.3 Survey File <br />AECOM will prepare a survey file and submit it to Caltrans Project Development and the City. <br />The Survey File is due to Caltrans 30 days prior to construction contract advertisement. The <br />Survey File submittal will conform to Caltrans' Proiect Development Activities Guide and <br />include: <br />• Control traverses and bench circuits used to design the project <br />• Alignment traverses of all Control lines <br />• Bridge traverses with coordinates on abutment layout lines <br />• Other structures (i.e. retaining wall) traverses with coordinates on layout lines <br />• Grid grades with data for: <br />o Slope stakes <br />o Finish Grade stakes <br />o Contour grading stakes <br />• Design Cross Sections <br />• Drainage notes including: <br />o Coordinates of intersection of center of drainage structure and curb flowline. <br />o Drainage structure system number, item letter, station and offset. <br />Page 47 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PS&E <br />
The URL can be used to link to this page
Your browser does not support the video tag.