Laserfiche WebLink
4.0 MILESTONE SCHEDULE <br />AECOM will perform and complete the Work described in the Scope of Services in <br />accordance with the Milestone Schedule provided in this Section. <br />Prolect Milestones <br />Date <br />Begin Design <br />08/17 <br />Structure Type Selection <br />1/18 <br />Right of Way Requirements (Initial) <br />1/18 <br />CT Appraisal Map Approval <br />4/18 <br />65% PS&E (Roadway) <br />05/18 <br />65%PS&E (Structure) <br />07/18 <br />95% PS&E (Roadway) <br />12/18 <br />95% PS&E (Structure) <br />03/19 <br />100% PS&E (Roadway) <br />04/19 <br />100% PS&E (Structure) <br />05/19 <br />Final PS&E <br />07/19 <br />This assumes Caltrans standard review times for the reviews, in accordance with Caltrans <br />District 04 Standard Quality Assurance Submittal Requirements & Review Durations. <br />Page 52 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PS&E <br />