Laserfiche WebLink
Table B-4 <br />TOTAL COMPENSATION <br />V&A CONSULTING ENGINEERS <br />CONTRACT PRICING PROPOSAL <br />Proposer: <br />V&A Consulting Engineers <br />DETAIL DESCRIPTION OF COST ELEMENTS: <br />Corrosion Testing/Recommendations: As -needed consultation based on Caltrans corrosion <br />requirements for bridge replacement structures and associated approach embankment walls at the <br />101/Woodside interchange reconstruction project forthe City of Redwood City. Tasks may include <br />document review, field soil resistivity testing, soil corrosivity report with corrosion control <br />recommendations, technical assistance, and project management. <br />11. DIRECT LABOR (Specify) <br />(Principal in Charge (G. Willson) <br />1Sr. Project Manager (C. Sheldon) <br />1Project Manager (C. Teall) <br />1Associate Engineer (M. Snow) <br />1Assistant Engineer (M. Tam) <br />Engineering Assistant (W. Pester) <br />EngineeringAssistant(T. Lam) 1 <br />I I <br />I I <br />I I <br />14. SUBCONSULTANT COSTS I <br />IS. OTHER DIRECT COSTS 1 <br />ITruck $85/day <br />l <br />I Mileage $0.535/mile+ <br />(Office and Field Expenses (est.) 1 <br />16. TOTAL I <br />Estimated Hours I <br />Rate/Hour <br />101 <br />$79.33 <br />41 <br />$69.71 <br />321 <br />$59.62 <br />219.200% <br />10.000% <br />Page 72 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PS&E <br />481 $38.46 <br />241 $39.66 <br />21 $27.881 <br />81 $48.081 <br />ISUBTOTAL I <br />10VERHEAD I <br />ITOTALLABOR <br />FEE I <br />TOTAL PRIME II <br />I I <br />I I <br />I I <br />I I <br />TOTAL <br />ESTIMATED <br />COST W/FEE <br />Estimated Cost ($) <br />$793.301 <br />$278.841 <br />$1,907.841 <br />$1,846.081 <br />$951.841 <br />$55.761 <br />$384.641 <br />$6,218.301 <br />$13,630.511 <br />$19,848.811 <br />$1,984.881 <br />$21,833.691 <br />$0.001 <br />$441.311 <br />$85.001 <br />$42.801 <br />$313.511 <br />$22,275,00 <br />