Laserfiche WebLink
Table B-5 <br />TOTAL COMPENSATION <br />WRECO, INC. <br />CONTRACT PRICING PROPOSAL <br />Proposer: <br />WRECO <br />DETAIL DESCRIPTION OF COST ELEMENTS: <br />Prepare HydroMod Memo, SWDR, & Drainage Report for 101/Woodside Interchange Project <br />1. DIRECT LABOR (Specify) <br />Principal Engineer <br />Supervising Engineer <br />senior Engineer II <br />ISenior Engineer I <br />Associate Engineer <br />Staff Engineer <br />Senior Technician <br />Tech Editor/Clerical <br />1 <br />14. SUBCONSULTANT COSTS <br />Estimated Hours Rate/Hour <br />134.970% <br />10.000 <br />S. OTHER DIRECT COSTS (misc travel, print, postage) <br />6. TOTAL <br />Page 73 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PS&E <br />12 $91.68 <br />48 $75.79 <br />76 $68.53 <br />72 $51.39 <br />200 $41.151 <br />1801 $34.991 <br />76 $37.031 <br />161 $28.811 <br />SUBTOTAL <br />OVERHEAD <br />ITOTALLABOR <br />IFEE <br />(TOTAL PRIME <br />TOTAL <br />ESTIMATED <br />COST W/FEE <br />Estimated Cost ($) <br />$1,100.161 <br />$3,637.921 <br />$5,208.281 <br />$3,700.08 <br />$8,230.00 <br />$6,298.20 <br />$2,814.28 <br />$460.96 <br />$31,449.881 <br />$42,447.901 <br />$73,897.781 <br />$7,389.781 <br />$81,287.561 <br />$2,852.001 <br />$84,139.56 <br />